INTERPORT

Live / Applied — Non-final action mailed (as of 02 Nov 2026)

Now

Refused for now — an office action was mailed 02 Nov 2026.

A response is due by 02 Feb 2027; with no response the application is abandoned.

What this means for you

Not registered yet, but its 30 Jun 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99913803
Mark type
Word mark
Filed
30 Jun 2026
Attorney of record
Devon E. White

Goods and services

  • Class 009 — Scientific and electric apparatus: Electrical apparatus and instruments for power conversion, distribution, and management, namely, solid state transformers; modular, multi port electrical power conversion systems; electrical power routing and control units; electrical power dispensing units for delivering controlled electrical power to downstream loads; electrical power management hardware incorporating solid state switching devices; electrical infrastructure equipment for integrating multiple electrical energy sources and loads, and structural parts and fittings therefor; electrical power distribution systems
  • Class 011 — Environmental control apparatus: Solid state electric power supply apparatus; electric apparatus for supplying electric energy to data centers and industrial facilities; electric vehicle charging apparatus for supplying electric power; electric power distribution apparatus for end use delivery of electricity
  • Class 042 — Scientific and technological services: Engineering, research and development, and design services in the field of electrical power systems and solid-state transformer technology; product development and engineering services for others relating to modular electrical power conversion and distribution platforms; design and development of integrated hardware and software systems for managing, routing, blending, and controlling electrical power across multiple electrical energy sources and loads in real time; technical consulting and design services in the fields of energy infrastructure architecture, electrical system integration, and electrification solutions; Software as a service (SaaS) featuring software for monitoring, configuring, optimizing, and controlling electrical power conversion and distribution systems; customized materials assembly for others in the field of energy production and generation; Design and integration of software-defined electrical infrastructure systems for commercial, industrial, transportation, and data center environments

Owner

Prosecution history

  • 02 Nov 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 02 Nov 2026 — NON-FINAL ACTION E-MAILED
  • 02 Nov 2026 — NON-FINAL ACTION WRITTEN
  • 02 Nov 2026 — ASSIGNED TO EXAMINER
  • 26 Oct 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 30 Jun 2026 — APPLICATION FILING RECEIPT MAILED
  • 30 Jun 2026 — NEW APPLICATION ENTERED

View this trademark record on Rightsy