APPLIED XVISION

Live / Applied — Non-final action mailed (as of 03 Nov 2026)

Now

Refused for now — an office action was mailed 03 Nov 2026.

A response is due by 03 Feb 2027; with no response the application is abandoned.

What this means for you

Not registered yet, but its 10 Jun 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
99876456
Mark type
Word mark
Filed
10 Jun 2026
Attorney of record
Anthony J. Malutta

Goods and services

  • Class 007 — Machines and machine tools: Semiconductor manufacturing machines and machine tools, namely, machines for wafer processing featuring x-ray systems
  • Class 009 — Scientific and electric apparatus: Semiconductor metrology, inspection, review, and testing apparatus and instruments, namely, electron-beam and optical inspection systems, critical dimension measurement systems, x-ray imaging systems, and defect review and defect analysis apparatus
  • Class 037 — Building construction and repair services: Installation, maintenance and repair of semiconductor manufacturing machines and semiconductor metrology and inspection apparatus

Owner

Prosecution history

  • 03 Nov 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 03 Nov 2026 — NON-FINAL ACTION E-MAILED
  • 03 Nov 2026 — NON-FINAL ACTION WRITTEN
  • 22 Oct 2026 — ASSIGNED TO EXAMINER
  • 21 Oct 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 10 Jun 2026 — APPLICATION FILING RECEIPT MAILED
  • 10 Jun 2026 — NEW APPLICATION ENTERED

View this trademark record on Rightsy