GATE VIKING ENGINEERING & LAB
Live / Applied — Final refusal mailed (as of 08 Nov 2026)
Now
Refused — a final office action was mailed 08 Nov 2026.
A response is due by 08 Feb 2027; with no response the application is abandoned.
What this means for you
Not registered yet, but its 14 Dec 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99547147
- Mark type
- Design + words
- Filed
- 14 Dec 2025
- Attorney of record
- Margaret A. Boulware
Goods and services
- Class 037 — Building construction and repair services: Engineering project management in the nature of construction project management services
- Class 042 — Scientific and technological services: Engineering services for energy facilities and assets and of all aspects of onshore and offshore oil and gas drilling completions and production including flow assurance, chemical systems engineering, production chemistry engineering, materials selection and corrosion engineering, sub-surface engineering, flow computer modeling services, computer systems engineering, computer database systems monitoring support services, maintenance management planning, process hazard analysis facilitation, facilities, topsides and subsea startup support, engineering project management, pipeline pigging engineering support, well engineering, engineering consulting.; Metallurgical laboratory services in the areas of materials chemical analysis, metallographic evaluations, microstructural characterization, corrosion testing, fracture surface evaluations (SEM/EDS fractography evaluations), mechanical testing (tensile, hardness, CVN), field inspections, finite element analysis (FEA), failure analysis, namely, forensic engineering, field investigation, legal support/expert witness, root cause analysis and fit-for purpose evaluations.
- Class 045 — Legal and security services: Legal support in the nature of expert witness services in legal matters in the field of energy facilities engineering and metallurgy
Owner
- GIBSON IP, LLC, Houston, TX, US
Prosecution history
- 08 Nov 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 08 Nov 2026 — FINAL REFUSAL E-MAILED
- 08 Nov 2026 — FINAL REFUSAL WRITTEN
- 18 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 18 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 18 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 18 May 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 18 May 2026 — NON-FINAL ACTION E-MAILED
- 18 May 2026 — NON-FINAL ACTION WRITTEN
- 17 Apr 2026 — ASSIGNED TO EXAMINER
- 09 Apr 2026 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 09 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 14 Dec 2025 — APPLICATION FILING RECEIPT MAILED
- 14 Dec 2025 — NEW APPLICATION ENTERED