IMI A DCS COMPANY
Live / Applied — Response to non-final action entered (as of 08 Oct 2026)
What this means for you
Not registered yet, but its 27 Oct 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99464448
- Mark type
- Design + words
- Filed
- 27 Oct 2025
- Attorney of record
- Matthew G. McKinney
Goods and services
- Class 037 — Building construction and repair services: Installation, maintenance and repair of industrial machinery, namely, physical industrial conveyor machinery and industrial material handling machinery; all of the foregoing excluding installation, maintenance, and repair services relating to valves, valve slides, valve flaps, fluid-control systems, flow-control systems, HVAC systems, hydronics systems, oil and gas process systems, fossil power process systems, nuclear power process systems, petrochemical process systems, desalination process systems, electronics, computer hardware, and computer software.
- Class 040 — Treatment of materials: Custom fabrication of industrial machinery, namely, physical industrial conveyor machinery and industrial material handling machinery; all of the foregoing excluding electronics contract manufacturing and assembly of electronic products for others.
Owner
- DESIGNED CONVEYOR SYSTEMS, LLC, Franklin, TN, US
Prosecution history
- 08 Oct 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 08 Oct 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 08 Oct 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 08 Jul 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 08 Jul 2026 — NON-FINAL ACTION E-MAILED
- 08 Jul 2026 — NON-FINAL ACTION WRITTEN
- 17 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 17 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 17 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 03 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 03 Mar 2026 — NON-FINAL ACTION E-MAILED
- 03 Mar 2026 — NON-FINAL ACTION WRITTEN
- 23 Feb 2026 — ASSIGNED TO EXAMINER
- 20 Feb 2026 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 20 Feb 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED