EDGE
Live / Applied — Statement of use — non-final action mailed (as of 04 Sept 2026)
Now
Refused for now — an office action was mailed 04 Sept 2026.
A response is due by 04 Dec 2026; with no response the application is abandoned.
What this means for you
Not registered yet, but its 09 Oct 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99434817
- Mark type
- Word mark
- Filed
- 09 Oct 2025
- Published for opposition
- 07 Apr 2026
- Attorney of record
- George Pappas
Goods and services
- Class 006 — Metal goods: Steel produced in an electric arc furnace utilizing 100% renewable or nuclear electricity, with all associated environmental attributes, sold for use in the manufacturing of steel products; Steel produced in an electric arc furnace utilizing 100% renewable or nuclear electricity, with all associated environmental attributes, sold for use in slitting, cutting, stamping, roll forming manufacturing processes, coating and other steel processing; Steel consisting of hot roll, cold roll, and coated sheet steel, structural steel beams and shapes, rail, engineered special-bar-quality steel, cold finished steel, merchant bar products, specialty steel sections, produced in an electric arc furnace utilizing 100% renewable or nuclear electricity, with all associated environmental attributes; Steel produced in an electric arc furnace with reduced carbon emissions sold for use in the manufacturing of steel products; Steel produced in an electric arc furnace with reduced carbon emissions sold for use in slitting, cutting, stamping, roll forming manufacturing processes, coating and other steel processing; Steel consisting of hot roll, cold roll, and coated sheet steel, structural steel beams and shapes, rail, engineered special-bar-quality steel, cold finished steel, merchant bar products being specialty steel sections, produced in an electric arc furnace with reduced carbon emissions
Owner
- STEEL DYNAMICS, INC., Fort Wayne, IN, US
- STEEL DYNAMICS, INC., Fort Wayne, IN, US
Prosecution history
- 04 Sept 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 04 Sept 2026 — NON-FINAL ACTION E-MAILED
- 04 Sept 2026 — SU - NON-FINAL ACTION - WRITTEN
- 02 Sept 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 29 Jul 2026 — USE AMENDMENT FILED
- 29 Jul 2026 — TEAS STATEMENT OF USE RECEIVED
- 02 Jun 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 07 Apr 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 Apr 2026 — PUBLISHED FOR OPPOSITION
- 01 Apr 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 Mar 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 11 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 11 Mar 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 11 Mar 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 02 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED