INTERSECT
Live / Applied — Final refusal mailed (as of 13 Aug 2026)
Now
Refused — a final office action was mailed 13 Aug 2026.
A response is due by 13 Feb 2027; with no response the application is abandoned.
What this means for you
Not registered yet, but its 04 Sept 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99374430
- Mark type
- Word mark
- Filed
- 04 Sept 2025
- Attorney of record
- Holly Pranger
Goods and services
- Class 037 — Building construction and repair services: Infrastructure development in the field of data center facilities, and renewable energy, oil and gas energy, natural gas, and clean fuel-based power plants, equipment and facilities; Installation, maintenance, and repair of data center facilities, and renewable energy, oil and gas energy, natural gas, and clean fuel-based power plants, equipment and facilities; Leasing of energy and data center infrastructure for data center facilities, and renewable energy, oil and gas energy, natural gas, and clean fuel-based power plants; Maintenance and repair of equipment for the operation of solar, natural gas, and wind power plants and facilities and data center facilities; Infrastructure development in the field of wind and solar energy systems and alternative energy products for residential, commercial and industrial use; Installation, maintenance and repair of wind and solar energy systems and alternative energy products for residential and commercial use; Leasing of energy infrastructure for wind and solar energy systems and alternative energy products for residential, commercial and industrial use; Consultancy relating to the infrastructure development, installation, leasing of energy infrastructure, maintenance and repair of windmills and wind turbines; Infrastructure development, installation, leasing of energy and data center infrastructure, maintenance and repair services in the field of distributed energy generation, namely, infrastructure development, installation, leasing of energy and data center infrastructure, maintenance, and repair of energy storage systems and co-generation systems; EV charging station services for electric vehicles; Leasing of EV charging stations and EV charging leasing services for electric vehicles; Infrastructure development and construction of energy, renewable energy, clean energy, wind energy, oil and gas energy, natural gas energy, and solar energy based power plants and facilities, and data center facilities; Construction planning in the nature of construction management of clean infrastructure systems of renewable energy, oil and gas energy, natural gas energy, and clean fuel-based power plants, and data center facilities; Construction consulting in the field of renewable energy, oil and gas energy, natural gas energy, and clean fuel-based plants and data center facilities
Owner
- INTERSECT USA, LLC, San Francisco, CA, US
- Intersect Power, LLC, Beaverton, OR, US
Prior registrations
Prosecution history
- 16 Oct 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 16 Oct 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 13 Aug 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 13 Aug 2026 — FINAL REFUSAL E-MAILED
- 13 Aug 2026 — FINAL REFUSAL WRITTEN
- 24 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 12 Apr 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 12 Apr 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 12 Apr 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 12 Apr 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 12 Apr 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 26 Feb 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 26 Feb 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED