CMW GLOBAL
Live / Applied — Suspended — suspension letter mailed (as of 06 Jul 2026)
What this means for you
Not registered yet, but its 06 Aug 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99323529
- Mark type
- Word mark
- Filed
- 06 Aug 2025
- Attorney of record
- Angela P. Doughty
Goods and services
- Class 035 — Advertising and business services: Business project management services for others in the field of product design and manufacturing, namely, planning, controlling scope, schedule, and cost management and variances, identifying and managing project risks, monitoring and improving technical performance, and maintaining quality control; business consulting services for others in the field of design, planning, and implementation of business project management for improving manufacturability, reducing costs, and increasing the long-term quality of the final product
- Class 037 — Building construction and repair services: Assembly services relating to the installation of mechanical and manufacturing equipment; Removal, installation, repair, maintenance, replacement, and refurbishment of mechanical and manufacturing equipment; Assembly services relating to the installation of manufacturing equipment parts built to the order and specifications of others
- Class 040 — Treatment of materials: Custom fabrication and reproduction of complex parts, namely, pressure vessels, heat exchangers, tanks, agitators, reactors, dryers, columns, pumps, centrifuges, turbine components, piping systems, cooling systems, ASME-coded vessels, filters, jacketed vessels, nozzles, flanges, valves, impellers, shafts, and housings for use in the aerospace, defense, chemical, pharmaceutical, nuclear, pulp and paper, power generation, and mining industries through precision machining; custom manufacture of complex parts, namely, pressure vessels, heat exchangers, tanks, agitators, reactors, dryers, columns, pumps, centrifuges, turbine components, piping systems, cooling systems, ASME-coded vessels, filters, jacketed vessels, nozzles, flanges, valves, impellers, shafts, and housings for use in the aerospace, defense, chemical, pharmaceutical, nuclear, pulp and paper, power generation, and mining industries through precision machining; forging of metal goods to the order and specification of others; machine shop services, namely, machining parts for others; custom computer numerical control (CNC) machining of components, parts, and equipment; welding services; custom manufacturing of components, parts, and equipment comprised of metals, steels, high-strength alloys, superalloys, ceramics based on build-to-print specifications of others; technical consultation for others in the fields of custom manufacturing precision components of manufacturing equipment and build-to-print packing systems
- Class 042 — Scientific and technological services: Testing, analysis, and evaluation of metal tools, machinery, and fabrication equipment; engineering design services for use in manufacturing, assembly, and test machinery; engineering research services in the fields of custom manufacturing precision components and build-to-print packing systems; product development for others in the fields of custom manufacturing precision components and build-to-print packing systems; Testing of new products for others in the fields of custom manufacturing precision components and build-to-print packing systems; quality control for others all in the fields of custom manufacturing precision components and build-to-print packing systems
Owner
- Carver Machine Works, Inc., Washington, NC, US
Prosecution history
- 06 Jul 2026 — NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
- 06 Jul 2026 — LETTER OF SUSPENSION E-MAILED
- 06 Jul 2026 — SUSPENSION LETTER WRITTEN
- 19 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 19 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 19 May 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Feb 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Feb 2026 — NON-FINAL ACTION E-MAILED
- 25 Feb 2026 — NON-FINAL ACTION WRITTEN
- 24 Feb 2026 — ASSIGNED TO EXAMINER
- 19 Dec 2025 — ASSIGNED TO EXAMINER
- 15 Dec 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 06 Aug 2025 — APPLICATION FILING RECEIPT MAILED
- 06 Aug 2025 — NEW APPLICATION ENTERED