FR240
Live / Applied — Non-final action mailed (as of 25 Aug 2026)
What this means for you
Not registered yet, but its 31 Jul 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 99313137
- Mark type
- Word mark
- Filed
- 31 Jul 2025
- Attorney of record
- Dean G. Stathakis
Goods and services
- Class 019 — Non-metallic building materials: Non-metal fire and heat resistant construction and building materials, namely, fire and heat resistant pre-cast and modular concrete composite blocks, wall, floor and ceiling boards, building panels, concrete composite slabs, walls, posts, and columns for buildings and fences, perimeter concrete walls, gates, doors, perimeter fencing and crash barriers; Non-metal pre-cast and modular fire and heat resistant materials, namely concrete composite blocks, wall, floor and ceiling boards, building panels, concrete composite slabs, walls, posts, and columns for buildings and fences, perimeter concrete walls, gates, doors, perimeter fencing and crash barriers; Pre-cast and modular fire and heat resistant construction materials not made of metal for construction purposes, namely, fire and heat resistant concrete composite blocks, wall, floor and ceiling boards, building panels, concrete composite slabs, walls, posts, and columns for buildings and fences, perimeter concrete walls, gates, doors, perimeter fencing and crash barriers; Fire and heat resistant materials, namely concrete composite blocks, wall, floor and ceiling boards, building panels, concrete composite slabs, walls, posts, and columns for buildings and fences, perimeter concrete walls, gates, doors, perimeter fencing and crash barriers, for construction
Owner
- 3B Protection International, Inc., Tequesta, FL, US
Prosecution history
- 25 Aug 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Aug 2026 — NON-FINAL ACTION E-MAILED
- 25 Aug 2026 — NON-FINAL ACTION WRITTEN
- 25 Aug 2026 — USE AMENDMENT ACCEPTED
- 10 Aug 2026 — AMENDMENT TO USE PROCESSING COMPLETE
- 10 Aug 2026 — USE AMENDMENT FILED
- 10 Aug 2026 — TEAS AMENDMENT OF USE RECEIVED
- 10 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 10 May 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 10 May 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 10 Feb 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 10 Feb 2026 — NON-FINAL ACTION E-MAILED
- 10 Feb 2026 — NON-FINAL ACTION WRITTEN
- 31 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 31 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE