CIRCUIT HAWK
Live / Registered — Registered (as of 14 Apr 2026)
What this means for you
Registered since 14 Apr 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 14 Apr 2032: the §8 declaration of use).
Record
- Serial number
- 99201363
- Registration number
- 8210213
- Mark type
- Word mark
- Filed
- 24 May 2025
- Published for opposition
- 24 Feb 2026
- Registered
- 14 Apr 2026
- Next maintenance filing
- §8 declaration of use, due by 14 Apr 2032 (grace period to 14 Oct 2032)
- Attorney of record
- Roy D. Gross
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable computer software for electronic design automation (EDA) in the nature of computer-aided design, reliability, availability, maintainability and safety (RAMS) analysis and optimizing maintenance systems for integrated logistic support (ILS); Downloadable computer software for detailed analysis of electrical stress; Downloadable computer software for using artificial intelligence (AI) for automated circuit stress calculation; Downloadable computer software for using artificial intelligence (AI) for analyzing individual components of a system; Downloadable computer software for thermal resistance data and stress metrics for 3D thermal simulations; Downloadable computer software for collecting comprehensive data on PCB components and their operational conditions; Downloadable computer software for engineering applications; Downloadable computer software for engineering design tools, namely detecting failure modes, effects, and criticality analysis
Owner
- BQR Reliability Engineering, Ltd., Rishon Le Zion, IL
- BQR Reliability Engineering, Ltd., Rishon Le Zion, IL
- BQR Reliability Engineering, Ltd., Rishon Le Zion, IL
Prosecution history
- 14 Apr 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 14 Apr 2026 — REGISTERED-PRINCIPAL REGISTER
- 24 Feb 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Feb 2026 — PUBLISHED FOR OPPOSITION
- 18 Feb 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 27 Jan 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 13 Jan 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 13 Jan 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 13 Jan 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 13 Oct 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 13 Oct 2025 — NON-FINAL ACTION E-MAILED
- 13 Oct 2025 — NON-FINAL ACTION WRITTEN
- 12 Oct 2025 — ASSIGNED TO EXAMINER
- 24 May 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 May 2025 — NEW APPLICATION ENTERED