PHILLIPS POWER
Live / Registered — Registered (as of 25 Aug 2026)
What this means for you
Registered since 25 Aug 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 25 Aug 2032: the §8 declaration of use).
Record
- Serial number
- 99178228
- Registration number
- 8417373
- Mark type
- Word mark
- Filed
- 09 May 2025
- Registered
- 25 Aug 2026
- Next maintenance filing
- §8 declaration of use, due by 25 Aug 2032 (grace period to 25 Feb 2033)
- Attorney of record
- Adam S. Baldridge
Goods and services
- Class 037 — Building construction and repair services: Construction services being site clearing, excavation, right of way, and general contracting; power infrastructure preparation and construction services to permit transmission and distribution electrical power; construction and installation of security walls around power stations; power infrastructure preparation being wind turbine and solar array pad excavation; substation and generation facility pad preparation; trenching for electrical, telecommunications and fiber optics; access road subgrade preparation; rough and fine grading; soil stabilization and compaction; slope grading and stabilization; Disaster response and recovery services, namely, re-electrification in response to storm damage being repair of electrical powerlines, grids, and power substations
Owner
- Phillips Infrastructure Corp., Knoxville, TN, US
- Phillips Infrastructure Corp., Knoxville, TN, US
Prosecution history
- 25 Aug 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 25 Aug 2026 — REGISTERED-SUPPLEMENTAL REGISTER
- 28 Jul 2026 — APPROVED FOR REGISTRATION SUPPLEMENTAL REGISTER
- 28 Jul 2026 — USE AMENDMENT ACCEPTED
- 02 Jul 2026 — AMENDMENT TO USE PROCESSING COMPLETE
- 02 Jul 2026 — USE AMENDMENT FILED
- 02 Jul 2026 — TEAS AMENDMENT OF USE RECEIVED
- 02 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 13 Apr 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
- 13 Apr 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
- 13 Jan 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 13 Jan 2026 — NON-FINAL ACTION E-MAILED
- 13 Jan 2026 — NON-FINAL ACTION WRITTEN
- 22 Dec 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 22 Dec 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE