NVIRO

Live / Registered — Registered (as of 29 Sept 2026)

What this means for you

Registered since 29 Sept 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 29 Sept 2032: the §8 declaration of use).

Record

Serial number
99088604
Registration number
8472231
Mark type
Word mark
Filed
17 Mar 2025
Published for opposition
18 Nov 2025
Registered
29 Sept 2026
Next maintenance filing
§8 declaration of use, due by 29 Sept 2032 (grace period to 29 Mar 2033)
Attorney of record
April Wurster

Goods and services

  • Class 037 — Building construction and repair services: Installation, maintenance and repair of water supply apparatus; Repair or maintenance of water purifying apparatus for industrial purposes; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services
  • Class 040 — Treatment of materials: Treatment of waste water from industrial processes; Sustainable on-site water recycling and wastewater treatment services; Manufacture of general product lines in the field of water and wastewater treatment to the order and specification of others
  • Class 042 — Scientific and technological services: Engineering services and consultation for the detection of contaminants in water and wastewater

Owner

  • NVIRO, San Luis Obispo, CA, US
  • NVIRO, San Luis Obispo, CA, US
  • NVIRO, San Luis Obispo, CA, US

Prosecution history

  • 30 Sept 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 30 Sept 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 30 Sept 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 30 Sept 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
  • 30 Sept 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
  • 29 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 29 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 08 Sept 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 08 Sept 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 18 Aug 2026 — STATEMENT OF USE PROCESSING COMPLETE
  • 30 Jun 2026 — USE AMENDMENT FILED
  • 01 Jul 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 30 Jun 2026 — TEAS STATEMENT OF USE RECEIVED
  • 01 Jul 2026 — SOU EXTENSION 1 GRANTED
  • 30 Jun 2026 — SOU EXTENSION 1 FILED

View this trademark record on Rightsy