NVIRO
Live / Registered — Registered (as of 29 Sept 2026)
What this means for you
Registered since 29 Sept 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 29 Sept 2032: the §8 declaration of use).
Record
- Serial number
- 99088604
- Registration number
- 8472231
- Mark type
- Word mark
- Filed
- 17 Mar 2025
- Published for opposition
- 18 Nov 2025
- Registered
- 29 Sept 2026
- Next maintenance filing
- §8 declaration of use, due by 29 Sept 2032 (grace period to 29 Mar 2033)
- Attorney of record
- April Wurster
Goods and services
- Class 037 — Building construction and repair services: Installation, maintenance and repair of water supply apparatus; Repair or maintenance of water purifying apparatus for industrial purposes; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services
- Class 040 — Treatment of materials: Treatment of waste water from industrial processes; Sustainable on-site water recycling and wastewater treatment services; Manufacture of general product lines in the field of water and wastewater treatment to the order and specification of others
- Class 042 — Scientific and technological services: Engineering services and consultation for the detection of contaminants in water and wastewater
Owner
Prosecution history
- 30 Sept 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 30 Sept 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 30 Sept 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 30 Sept 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 30 Sept 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 29 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 29 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
- 08 Sept 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 08 Sept 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 18 Aug 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 30 Jun 2026 — USE AMENDMENT FILED
- 01 Jul 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Jun 2026 — TEAS STATEMENT OF USE RECEIVED
- 01 Jul 2026 — SOU EXTENSION 1 GRANTED
- 30 Jun 2026 — SOU EXTENSION 1 FILED