PARAWEB

Live / Registered — Registered (as of 22 Sept 2026)

What this means for you

Registered since 22 Sept 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 22 Sept 2032: the §8 declaration of use).

Record

Serial number
98957044
Registration number
8452159
Mark type
Word mark
Filed
13 Jan 2025
Published for opposition
02 Dec 2025
Registered
22 Sept 2026
Next maintenance filing
§8 declaration of use, due by 22 Sept 2032 (grace period to 22 Mar 2033)
Attorney of record
Jeffrey Goehring

Goods and services

  • Class 019 — Non-metallic building materials: Erosion control mats for construction; Geogrids for road construction; Nonmetallic construction materials, namely, drain bases and grates; Geotextiles for the purposes of drainage, stabilizing inclines, recultivation, plant support, absorption, filtration, separation, stabilization and reinforcement of the soil; Reinforcing materials not of metal for building purposes; Civil engineering construction and building materials made wholly or principally of synthetics, namely, geostrips; reinforcing and drainage material made of synthetics used for construction purposes, namely, geosynthetic strips not of metal; civil engineering construction and building materials made wholly or principally of non-metallic materials, namely, geosynthetic grids or grilles or grates not of metal; reinforcing and drainage material made of non-metallic materials used for construction purposes, namely, geostrips
  • Class 022 — Cordage and fibers: Ropes and synthetic ropes; Cords made of textile fibres; Synthetic webbing; Twine for nets; String; Wrapping or binding bands, not of metal; Rockfall prevention nets, not of metal; Netting, not of metal or asbestos; Ropes and cords, none being of metal; synthetic webbing; twine and string; Bands, not of metal, for wrapping or binding or reinforcing or tethering or strapping or anchoring; and commercial nets

Owner

Prosecution history

  • 22 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 01 Sept 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 01 Sept 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 25 Aug 2026 — STATEMENT OF USE PROCESSING COMPLETE
  • 17 Jul 2026 — USE AMENDMENT FILED
  • 17 Jul 2026 — TEAS STATEMENT OF USE RECEIVED
  • 27 Jan 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 02 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 02 Dec 2025 — PUBLISHED FOR OPPOSITION
  • 26 Nov 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 30 Oct 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 25 Sept 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 25 Sept 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 25 Sept 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 01 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED

View this trademark record on Rightsy