TMFZN
Live / Registered — Registered (as of 25 Aug 2026)
What this means for you
Registered since 25 Aug 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 25 Aug 2032: the §8 declaration of use).
Record
- Serial number
- 98937692
- Registration number
- 8414851
- Mark type
- Word mark
- Filed
- 05 Jan 2025
- Published for opposition
- 29 Jul 2025
- Registered
- 25 Aug 2026
- Next maintenance filing
- §8 declaration of use, due by 25 Aug 2032 (grace period to 25 Feb 2033)
- Attorney of record
- Pei LYU
Goods and services
- Class 006 — Metal goods: Manually operated metal valves; Valves of metal other than parts of machines including those from alloy steel and titanium; Valves of metal, other than parts of machines; Water-pipe valves of metal
- Class 007 — Machines and machine tools: Compressed air machine components, namely, cylinders, valves and air grips; Electric pumps; Multi-phase screw pumps; Pneumatic pumps; Pneumatic valve actuators; Positive displacement pumps; Pump control valves; Pump diaphragms; Reverse osmosis pumps; Rotary lobe pumps; Rotary pumps; Screw pumps; Spray paint systems comprised of pumps, pump controllers, nozzles, tubing and valves; Valves as machine components; Valves being parts of machines operated pneumatically and by air; Valves for pumps
Owner
- Anhui Tuomufei Valve Intelligent Technology Co., Ltd., Xuancheng, Anhui, CN
- Anhui Tuomufei Valve Intelligent Technology Co., Ltd., Xuancheng, Anhui, CN
- Anhui Tuomufei Valve Intelligent Technology Co., Ltd., Xuancheng, Anhui, CN
Prosecution history
- 25 Aug 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 25 Aug 2026 — REGISTERED-PRINCIPAL REGISTER
- 06 Aug 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 Aug 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 23 Jun 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 23 Mar 2026 — USE AMENDMENT FILED
- 23 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 23 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 29 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Jul 2025 — PUBLISHED FOR OPPOSITION
- 23 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Jun 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 16 Jun 2025 — ASSIGNED TO EXAMINER
- 05 Jan 2025 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 05 Jan 2025 — NEW APPLICATION ENTERED