SPEEDAIRE
Live / Registered — Registered (as of 28 Jul 2026)
What this means for you
Registered since 28 Jul 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 28 Jul 2032: the §8 declaration of use).
Record
- Serial number
- 98914930
- Registration number
- 8370536
- Mark type
- Word mark
- Filed
- 20 Dec 2024
- Published for opposition
- 15 Jul 2025
- Registered
- 28 Jul 2026
- Next maintenance filing
- §8 declaration of use, due by 28 Jul 2032 (grace period to 28 Jan 2033)
- Attorney of record
- Candice M. Kwok
Goods and services
- Class 006 — Metal goods: Reels of metal, non-mechanical, for storing cables; Metal hose fittings
- Class 007 — Machines and machine tools: Balancers for power tools, namely, spring balancers being lifting apparatus; Retractors for power tools, namely, spring powered retractors for use in returning an object to a predetermined location; Power operated pneumatic inflators, namely, inflators for inflating dunnage bags; Power sander accessories, namely, abrasive disks for power-operated sanders, sanding pads for power-operated sanders; Power grinder accessories, namely, abrasive blades, abrasive discs, abrasive wheels and grinding wheels; Components for machines and machine parts, namely, V-belts, twin V-belts, V-ribbed belts, poly V-belts, twin V-ribbed belts, V-belt pulleys, V-ribbed belt pulleys
- Class 009 — Scientific and electric apparatus: Electrical cable reels
- Class 017 — Rubber goods: Nonmetallic pressure washer hose; Flexible high-pressure hoses, not of metal; Non-metal, plastic and rubber hoses for industrial applications; Non-metal hose fittings
Owner
- Dayton Electric Manufacturing Co., Lake Forest, IL, US
- Dayton Electric Manufacturing Co., Lake Forest, IL, US
- Dayton Electric Manufacturing Co., Lake Forest, IL, US
Prior registrations
Prosecution history
- 28 Jul 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 28 Jul 2026 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 08 Jul 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 07 Jul 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 17 Apr 2026 — USE AMENDMENT FILED
- 17 Apr 2026 — TEAS STATEMENT OF USE RECEIVED
- 07 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 06 Mar 2026 — SOU EXTENSION 1 GRANTED
- 06 Mar 2026 — SOU EXTENSION 1 FILED
- 06 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 09 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 15 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 15 Jul 2025 — PUBLISHED FOR OPPOSITION
- 09 Jul 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED