POWERED BY PEOPLE AND PERFORMANCE

Dead / Abandoned — Abandoned — failure to respond (as of 30 Oct 2025)

What this means for you

This application is over — abandoned 17 Oct 2025. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
98793023
Mark type
Slogan / phrase
Filed
09 Oct 2024
Abandoned
17 Oct 2025
Attorney of record
Thomas G. Dickson

Goods and services

  • Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, installation of environmental containment systems; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction

Owner

Prosecution history

  • 30 Oct 2025 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
  • 30 Oct 2025 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 16 Jul 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 16 Jul 2025 — NON-FINAL ACTION E-MAILED
  • 16 Jul 2025 — NON-FINAL ACTION WRITTEN
  • 16 Jul 2025 — LETTER OF PROTEST EVIDENCE REVIEWED - ACTION TAKEN
  • 23 Jun 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 23 Jun 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 23 Jun 2025 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 18 Jun 2025 — LETTER OF PROTEST EVIDENCE FORWARDED
  • 21 Mar 2025 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION E-MAILED
  • 21 Mar 2025 — NON-FINAL ACTION WRITTEN
  • 21 Mar 2025 — ASSIGNED TO EXAMINER
  • 09 Oct 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED

View this trademark record on Rightsy