Live / Registered — Registered (as of 21 Jul 2026)

What this means for you

Registered since 21 Jul 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 21 Jul 2032: the §8 declaration of use).

Record

Serial number
98793012
Registration number
8357552
Mark type
Word mark
Filed
09 Oct 2024
Published for opposition
29 Jul 2025
Registered
21 Jul 2026
Next maintenance filing
§8 declaration of use, due by 21 Jul 2032 (grace period to 21 Jan 2033)
Attorney of record
Thomas G. Dickson

Goods and services

  • Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, installation of environmental containment systems; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction

Owner

Prosecution history

  • 21 Jul 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 21 Jul 2026 — REGISTERED-PRINCIPAL REGISTER
  • 02 Jul 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 02 Jul 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 24 Jun 2026 — STATEMENT OF USE PROCESSING COMPLETE
  • 31 Mar 2026 — USE AMENDMENT FILED
  • 24 Jun 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 31 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
  • 21 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 20 Mar 2026 — SOU EXTENSION 1 GRANTED
  • 20 Mar 2026 — SOU EXTENSION 1 FILED
  • 20 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 23 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 29 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 29 Jul 2025 — PUBLISHED FOR OPPOSITION