POWERED BY PERFORMANCE
Live / Registered — Registered (as of 21 Jul 2026)
What this means for you
Registered since 21 Jul 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 21 Jul 2032: the §8 declaration of use).
Record
- Serial number
- 98793012
- Registration number
- 8357552
- Mark type
- Word mark
- Filed
- 09 Oct 2024
- Published for opposition
- 29 Jul 2025
- Registered
- 21 Jul 2026
- Next maintenance filing
- §8 declaration of use, due by 21 Jul 2032 (grace period to 21 Jan 2033)
- Attorney of record
- Thomas G. Dickson
Goods and services
- Class 037 — Building construction and repair services: Commercial building construction; Construction grading services; Construction of airports; Construction of civil engineering structures; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction of roads, underground utilities, and housing pads; Construction of wind power plants; Construction services, namely, installation of environmental containment systems; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Consulting services in the field of construction of wind energy facilities; Factory construction; General construction contracting; Hydro-electric factory construction; Hydroelectric factory construction; Laying and construction of pipelines; Pipeline construction; Road construction
Owner
- Ames Construction, Burnsville, MN, US
- Ames Construction, Burnsville, MN, US
- Ames Construction, Burnsville, MN, US
Prosecution history
- 21 Jul 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 21 Jul 2026 — REGISTERED-PRINCIPAL REGISTER
- 02 Jul 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 02 Jul 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 24 Jun 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 31 Mar 2026 — USE AMENDMENT FILED
- 24 Jun 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 31 Mar 2026 — TEAS STATEMENT OF USE RECEIVED
- 21 Mar 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 20 Mar 2026 — SOU EXTENSION 1 GRANTED
- 20 Mar 2026 — SOU EXTENSION 1 FILED
- 20 Mar 2026 — SOU TEAS EXTENSION RECEIVED
- 23 Sept 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 29 Jul 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Jul 2025 — PUBLISHED FOR OPPOSITION