BIOMASON
Live / Allowed — Third extension granted (statement of use) (as of 24 Sept 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 13 May 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98546458
- Mark type
- Word mark
- Filed
- 13 May 2024
- Published for opposition
- 01 Apr 2025
- Attorney of record
- Tyler Thorp
Goods and services
- Class 019 — Non-metallic building materials: Non-metallic building materials, namely, bricks, pavers, paving tiles, flooring tiles, non-metal wall tiles, roofing tiles, veneers not of metal, concrete veneers, concrete panels, concrete walls, wall panels not of metal, prefabricated walls not of metal, breeze blocks, cinder blocks, bollards, concrete masonry units, modular concrete barriers, and concrete blocks; building materials, namely, large precast structures not of metal for building and construction purposes, namely, precast beams, precast columns, and wall panels; non-metal sculptures and blocks of cementitious material for building and construction purposes; cementitious material for building purposes; cement mixes; concrete mixes; non-metallic building materials, namely, precast beams, precast columns, wall panels, architectural cladding, slabs, hollow core slabs, step treads, roof pavers, stone wall caps, decorative stone pavers, stone wall copings, pavestones, stepping stones, solid blocks, hollow blocks, block pads, and retaining wall block
Owner
- Biomason Inc., Durham, NC, US
- Biomason Inc., Durham, NC, US
Prosecution history
- 25 Sept 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Sept 2026 — SOU EXTENSION 3 GRANTED
- 24 Sept 2026 — SOU EXTENSION 3 FILED
- 24 Sept 2026 — SOU TEAS EXTENSION RECEIVED
- 03 Apr 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 Apr 2026 — SOU EXTENSION 2 GRANTED
- 02 Apr 2026 — SOU EXTENSION 2 FILED
- 02 Apr 2026 — SOU TEAS EXTENSION RECEIVED
- 22 Nov 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Nov 2025 — SOU EXTENSION 1 GRANTED
- 21 Nov 2025 — SOU EXTENSION 1 FILED
- 21 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 27 May 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 01 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 01 Apr 2025 — PUBLISHED FOR OPPOSITION