ZSANYA
Live / Registered — Registered (as of 14 Apr 2026)
What this means for you
Registered since 14 Apr 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 14 Apr 2032: the §8 declaration of use).
Record
- Serial number
- 98538773
- Registration number
- 8215866
- Mark type
- Word mark
- Filed
- 07 May 2024
- Published for opposition
- 24 Dec 2024
- Registered
- 14 Apr 2026
- Next maintenance filing
- §8 declaration of use, due by 14 Apr 2032 (grace period to 14 Oct 2032)
- Attorney of record
- Justin Brown
Goods and services
- Class 011 — Environmental control apparatus: Hand-held showers; Electric fans; Faucet handles; Faucets; Flexible pipes being parts of basin plumbing installations; Flexible pipes being parts of bath plumbing installations; Flexible pipes being parts of shower plumbing installations; Hand held shower heads; Hand showers; Hydrants; Plumbing fixtures, namely, shower mixers; Portable showers; Pressure-activated pop-up water sprinklers mounted on non-metal fence panels and posts; Shower head sprayers; Shower heads; Showerheads and components thereof; Single lever fixtures for lavatories and sinks; Spray heads for showers; Tap water faucets; Taps for bidets; Taps for washstands
Owner
- Xiamen Zeyoupin Technology Co., Ltd., Xiamen City, Fujian, CN
- Xiamen Zeyoupin Technology Co., Ltd., Xiamen City, Fujian, CN
- Xiamen Zeyoupin Technology Co., Ltd., Xiamen City, Fujian, CN
Prosecution history
- 14 Apr 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 14 Apr 2026 — REGISTERED-PRINCIPAL REGISTER
- 24 Mar 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 24 Mar 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 20 Feb 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 15 Aug 2025 — USE AMENDMENT FILED
- 20 Feb 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 15 Aug 2025 — TEAS STATEMENT OF USE RECEIVED
- 18 Feb 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 24 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Dec 2024 — PUBLISHED FOR OPPOSITION
- 18 Dec 2024 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 26 Nov 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Nov 2024 — ASSIGNED TO EXAMINER
- 05 Nov 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED