E4A

Live / Registered — Registered (as of 15 Sept 2026)

What this means for you

Registered since 15 Sept 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 15 Sept 2032: the §8 declaration of use).

Record

Serial number
98535797
Registration number
8429305
Mark type
Word mark
Filed
06 May 2024
Published for opposition
21 Jul 2026
Registered
15 Sept 2026
Next maintenance filing
§8 declaration of use, due by 15 Sept 2032 (grace period to 15 Mar 2033)
Attorney of record
Thomas W. Brooke

Goods and services

  • Class 037 — Building construction and repair services: Equipment assembly services relating to the installation, installation, repairs, and field commissioning being maintenance services of high-voltage, medium-voltage, and low voltage power systems; Electrical transformer monitoring system installation, repairs, and field commissioning being maintenance services; Maintenance and repair services of electrical power transformers and switch gears; Assembly services relating to the installation of electrical power systems
  • Class 042 — Scientific and technological services: Design and engineering services related to electrical high-voltage, medium-voltage, and low voltage power systems; Electrical power plant and substation engineering review services and operation, namely, engineering services in the field of electrical power plant and substation operation; Control and protection services related to electrical high-voltage, medium-voltage, and low voltage power systems, namely engineering services in the field of electrical high-voltage, medium-voltage, and low voltage power systems; Electrical transformer monitoring system design services;

Owner

Prosecution history

  • 15 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 08 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 08 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
  • 21 Jul 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 21 Jul 2026 — PUBLISHED FOR OPPOSITION
  • 15 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 22 Jun 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 22 Jun 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
  • 22 Jun 2026 — EXAMINER'S AMENDMENT ENTERED
  • 22 Jun 2026 — EXAMINERS AMENDMENT E-MAILED
  • 22 Jun 2026 — EXAMINERS AMENDMENT -WRITTEN
  • 02 Oct 2025 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 02 Oct 2025 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 10 Jul 2025 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 10 Jul 2025 — FINAL REFUSAL E-MAILED

View this trademark record on Rightsy