H
Live / Allowed — Third extension granted (statement of use) (as of 29 Jun 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 11 Apr 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98495409
- Mark type
- Stylized text
- Filed
- 11 Apr 2024
- Published for opposition
- 26 Nov 2024
- Attorney of record
- Matthew P. Hintz, Esq.
Goods and services
- Class 006 — Metal goods: Construction elements made of metal namely, metal struts, metal strut channel framing, metal strut framing systems comprised primarily of metal channels, metal channel screws, metal brackets, metal clamps, inserts and fittings, metal channel nuts, rod couplers, lock washers, bolts, seismic rod stiffeners, all-thread rods, channel end caps, metal strut channel and framing accessories, namely, brackets, nuts, washers, fittings, inserts, clamps and end caps; Construction elements made of metal, namely, metal supports for supporting pipes, conduits, solar racking, ducts, cable tray systems, rooftop walkways and HVAC systems on rooftops
- Class 011 — Environmental control apparatus: Heating elements; Hot water heating installations; Parts for hot water heating installations, namely, baseboards, fins, baseboard end caps, baseboard corner caps, baseboard brackets, baseboard joiners, expansion tracks, cover extensions, dampers, and heating elements
- Class 019 — Non-metallic building materials: Non-metal building material, namely, rubber roof-top supports, rubber roof-top supports with attached strut channels, rod clamps or rod extensions, rubber slip sheets for roof-top supports, and rubber pipe hanger supports
Owner
- Haydon Corporation, Wayne, NJ, US
- Haydon Corporation, Wayne, NJ, US
Prosecution history
- 30 Jun 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 29 Jun 2026 — SOU EXTENSION 3 GRANTED
- 29 Jun 2026 — SOU EXTENSION 3 FILED
- 29 Jun 2026 — SOU TEAS EXTENSION RECEIVED
- 01 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 31 Dec 2025 — SOU EXTENSION 2 GRANTED
- 31 Dec 2025 — SOU EXTENSION 2 FILED
- 31 Dec 2025 — SOU TEAS EXTENSION RECEIVED
- 03 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 Jul 2025 — SOU EXTENSION 1 GRANTED
- 02 Jul 2025 — SOU EXTENSION 1 FILED
- 02 Jul 2025 — SOU TEAS EXTENSION RECEIVED
- 07 Jan 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 26 Nov 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Nov 2024 — PUBLISHED FOR OPPOSITION