MAX

Live / Allowed — Third extension granted (statement of use) (as of 25 Aug 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 23 Feb 2024 filing date already counts against anyone who files later.

Record

Serial number
98418672
Mark type
Word mark
Filed
23 Feb 2024
Published for opposition
31 Dec 2024
Attorney of record
Bassam N. Ibrahim

Goods and services

  • Class 007 — Machines and machine tools: Industrial robots; Industrial robots for installing solar panels; Industrial robots for assisting in construction of renewable energy construction projects; Autonomous industrial robots for assisting in construction of renewable energy construction projects
  • Class 009 — Scientific and electric apparatus: Downloadable and recorded software for managing, optimizing, monitoring, and operating industrial robots in the field of renewable energy; Downloadable and recorded software for accessing data, analytics, and insights in the field of construction project management for renewable energy construction projects
  • Class 037 — Building construction and repair services: Rental of industrial robots for installing solar panels; Rental of industrial robots for assisting in construction of renewable energy construction projects; Installation, maintenance and repair of industrial robots; Robot-assisted building construction services and installation of renewable energy generation equipment for renewable energy construction projects
  • Class 042 — Scientific and technological services: Design and development of software for controlling robots; Design and development of industrial robots; Providing online non-downloadable software for managing, optimizing, monitoring and operating industrial robots in the field of renewable energy; Providing online non-downloadable software for controlling navigation of industrial robots in the field of renewable energy; Providing online non-downloadable software for accessing data, analytics, and insights in the field of construction project management for renewable energy construction projects

Owner

Prosecution history

  • 26 Aug 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 25 Aug 2026 — SOU EXTENSION 3 GRANTED
  • 25 Aug 2026 — SOU EXTENSION 3 FILED
  • 25 Aug 2026 — SOU TEAS EXTENSION RECEIVED
  • 25 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 24 Feb 2026 — SOU EXTENSION 2 GRANTED
  • 24 Feb 2026 — SOU EXTENSION 2 FILED
  • 24 Feb 2026 — SOU TEAS EXTENSION RECEIVED
  • 28 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 28 Jul 2025 — SOU EXTENSION 1 GRANTED
  • 28 Jul 2025 — SOU EXTENSION 1 FILED
  • 28 Jul 2025 — SOU TEAS EXTENSION RECEIVED
  • 25 Feb 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 31 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 31 Dec 2024 — PUBLISHED FOR OPPOSITION

View this trademark record on Rightsy