CAPITAL CONDUIT
Live / Allowed — Third extension granted (statement of use) (as of 11 Aug 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 14 Feb 2024 filing date already counts against anyone who files later.
Record
- Serial number
- 98404975
- Mark type
- Word mark
- Filed
- 14 Feb 2024
- Published for opposition
- 24 Dec 2024
- Attorney of record
- Meichelle R. MacGregor
Goods and services
- Class 009 — Scientific and electric apparatus: Plastic pipe conduit for electrical use; plastic conduit for electrical installations; PVC rigid conduit for electrical installations; Protective plastic risers for telecommunication cables and power wire in the nature of nonmetallic pole riser systems comprised of nonmetallic riser U-type guards, vented boots being plastic ventilated protecting cover for the union between the underground conduit and the riser guards, adapters in the nature of union or couplings for different sizes of riser guards, and backing plates, all specially adapted for use with telecommunication lines and power wire on power poles; plastic conduit fittings, namely, electric couplings, electric adapters, power connectors, caps for plastic conduits for electrical use; electrical receptacles, electrical switch and outlet boxes and electrical receptacle covers for switch and outlet boxes; electrical utility and communication ducts; plastic conduits for electrical use; flexible plastic pipe, flexible plastic conduits and nonmetal fittings for conduits all for electrical use
- Class 017 — Rubber goods: Flexible pipes, not of metal; flexible PVC pipes; flexible CPVC pipes; fittings and elbows for pipes, not of metal; boxes specially adapted for housing non-metal flexible pipes; plastics in extruded form for use in manufacture; non-metal pipe straps and elbows for plastic conduits
Owner
- ALVA MANUFACTURING, LLC, West Palm Beach, FL, US
- ALVA MANUFACTURING, LLC, RIVIERA BEACH, FL, US
- E-Z Weld Group LLC, Riviera Beach, FL, US
Prosecution history
- 12 Aug 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 11 Aug 2026 — SOU EXTENSION 3 GRANTED
- 11 Aug 2026 — SOU EXTENSION 3 FILED
- 11 Aug 2026 — SOU TEAS EXTENSION RECEIVED
- 14 May 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 05 Feb 2026 — SOU EXTENSION 2 GRANTED
- 05 Feb 2026 — SOU EXTENSION 2 FILED
- 05 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 13 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 12 Aug 2025 — SOU EXTENSION 1 GRANTED
- 12 Aug 2025 — SOU EXTENSION 1 FILED
- 12 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 18 Feb 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 24 Dec 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Dec 2024 — PUBLISHED FOR OPPOSITION