ENE
Live / Registered — Registered (as of 25 Feb 2025)
What this means for you
Registered since 25 Feb 2025. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 25 Feb 2031: the §8 declaration of use).
Record
- Serial number
- 98404759
- Registration number
- 7701746
- Mark type
- Word mark
- Filed
- 14 Feb 2024
- Published for opposition
- 07 Jan 2025
- Registered
- 25 Feb 2025
- Next maintenance filing
- §8 declaration of use, due by 25 Feb 2031 (grace period to 25 Aug 2031)
- Attorney of record
- Grant H. Peters
Goods and services
- Class 042 — Scientific and technological services: Design for others in the field of engineering, specifically, with regard to gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy, and corrosion control; Technical consultation in the field of engineering, specifically, with regard to gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy, and corrosion control
Owner
- EN Engineering, LLC, Warrenville, IL, US
- EN Engineering, LLC, Warrenville, IL, US
- EN Engineering, LLC, Warrenville, IL, US
Prior registrations
Prosecution history
- 25 Feb 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 25 Feb 2025 — REGISTERED-PRINCIPAL REGISTER
- 07 Jan 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 07 Jan 2025 — PUBLISHED FOR OPPOSITION
- 01 Jan 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 10 Dec 2024 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 10 Dec 2024 — EXAMINER'S AMENDMENT ENTERED
- 10 Dec 2024 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 10 Dec 2024 — EXAMINERS AMENDMENT E-MAILED
- 10 Dec 2024 — EXAMINERS AMENDMENT -WRITTEN
- 10 Sept 2024 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 10 Sept 2024 — NON-FINAL ACTION E-MAILED
- 10 Sept 2024 — NON-FINAL ACTION WRITTEN
- 06 Sept 2024 — ASSIGNED TO EXAMINER
- 16 Jun 2024 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED