E ENTRUST SOLUTIONS GROUP

Live / Registered — Registered (as of 27 Oct 2026)

What this means for you

Registered since 27 Oct 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 27 Oct 2032: the §8 declaration of use).

Record

Serial number
98404739
Registration number
8524634
Mark type
Design + words
Filed
14 Feb 2024
Published for opposition
07 Jan 2025
Registered
27 Oct 2026
Next maintenance filing
§8 declaration of use, due by 27 Oct 2032 (grace period to 27 Apr 2033)
Attorney of record
Andrew S. Ehard

Goods and services

  • Class 037 — Building construction and repair services: Construction project management, specifically, with regard to gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy facilities, and corrosion control systems; Inspection services in the course of construction of gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy facilities, and corrosion control systems
  • Class 042 — Scientific and technological services: Design for others in the field of engineering, specifically, with regard to gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy, and corrosion control; Technical consultation in the field of engineering, specifically, with regard to gas and liquids pipeline systems, gas distribution systems, electricity distribution, transmission and generation systems, fiber optic telecommunication networks, renewable energy, and corrosion control

Owner

Prior registrations

Prosecution history

  • 27 Oct 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 27 Oct 2026 — REGISTERED-PRINCIPAL REGISTER
  • 08 Oct 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 08 Oct 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 23 Sept 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 23 Sept 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 22 Sept 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 29 Jul 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 29 Jul 2026 — NON-FINAL ACTION E-MAILED
  • 29 Jul 2026 — SU - NON-FINAL ACTION - WRITTEN
  • 30 Jun 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
  • 30 Jun 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 30 Jun 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 30 Jun 2026 — ASSIGNED TO LIE
  • 29 Jun 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED

View this trademark record on Rightsy