NEWTECHWOOD
Live / Registered — Registered (as of 09 Jun 2026)
What this means for you
Registered since 09 Jun 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 09 Jun 2032: the §8 declaration of use).
Record
- Serial number
- 98360808
- Registration number
- 8296529
- Mark type
- Design + words
- Filed
- 17 Jan 2024
- Published for opposition
- 01 Apr 2025
- Registered
- 09 Jun 2026
- Next maintenance filing
- §8 declaration of use, due by 09 Jun 2032 (grace period to 09 Dec 2032)
- Attorney of record
- Zhi Dong
Goods and services
- Class 006 — Metal goods: Aluminum alloys; Metal beams; Alloys of common metal; Sheet metal, not of precious metal; Slabs of metal for building; Reinforcing materials of metal for building; Linings of metal for building; Metallic construction materials, encased in composite materials, namely, beams, boards, columns, louvers, slats, flooring, exterior wall covering, interior wall covering, fascia, panels
- Class 019 — Non-metallic building materials: Non-metal building products, namely, shutters, shingles, siding, and trim; Non-metal cladding for construction and building; Non-metal roof coverings; Non-metal roofing; Non-metal tiles; Non-metallic transportable buildings; Plywood; Reinforcing materials not of metal for building purposes; Roof flashing, not of metal; Roof gutters, not of metal; Decorative wall covering made of plastics, namely, plastic wallboards for decorative purpose; Transportable buildings, not of metal
- Class 020 — Furniture: Furniture; Trestle tables; Washstands being furniture; Shelving and component parts thereof, namely, shelves and brackets sold as a unit; Boxes of wood or plastic; Work benches; Furniture partitions of wood; Furniture fittings in the nature of wood ribbon for decoration; Furniture fittings, not of metal; Door fittings, not of metal
Owner
- NEWTECHWOOD CORPORATION, Guangdong Province, CN
- NEWTECHWOOD CORPORATION, Guangdong Province, CN
- NEWTECHWOOD CORPORATION, Guangdong Province, CN
Prosecution history
- 09 Jun 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 09 Jun 2026 — REGISTERED-PRINCIPAL REGISTER
- 19 May 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 19 May 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 21 Apr 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 26 Nov 2025 — USE AMENDMENT FILED
- 26 Nov 2025 — TEAS STATEMENT OF USE RECEIVED
- 27 May 2025 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 01 Apr 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 01 Apr 2025 — PUBLISHED FOR OPPOSITION
- 26 Mar 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 Mar 2025 — LAW OFFICE PUBLICATION REVIEW COMPLETED
- 11 Mar 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 14 Feb 2025 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 14 Feb 2025 — CORRESPONDENCE RECEIVED IN LAW OFFICE