CALHOUN-BURNS & ASSOCIATES, INC.
Live / Registered — Registered (as of 23 Jun 2026)
What this means for you
Registered since 23 Jun 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 23 Jun 2032: the §8 declaration of use).
Record
- Serial number
- 98260970
- Registration number
- 8315629
- Mark type
- Slogan / phrase
- Filed
- 08 Nov 2023
- Published for opposition
- 29 Oct 2024
- Registered
- 23 Jun 2026
- Next maintenance filing
- §8 declaration of use, due by 23 Jun 2032 (grace period to 23 Dec 2032)
- Attorney of record
- John Pickerill
Goods and services
- Class 037 — Building construction and repair services: Design and consulting services in the field of comprehensive planning, namely, planning and laying out of residential, public and/or commercial communities, properties and projects; construction consultation for public and private projects; providing building inspections in the course of building construction
- Class 042 — Scientific and technological services: Consulting services in the fields of civil and municipal engineering and material testing; surveying in the fields of land, construction and engineering; design and consulting services in the field of pipeline inspection and design; environmental design for others in the field of environmental engineering; civil engineering in the field of infrastructure design; design of water and wastewater treatment systems; water and wastewater resources in the nature of civil engineering relating to the construction of water treatment plants; inspection of the foregoing for quality control purposes
Owner
- VEENSTRA & KIMM, INC., West Des Moines, IA, US
- VEENSTRA & KIMM, INC., West Des Moines, IA, US
- VEENSTRA & KIMM, INC., West Des Moines, IA, US
Prosecution history
- 23 Jun 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 Jun 2026 — REGISTERED-PRINCIPAL REGISTER
- 29 May 2026 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 29 May 2026 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 28 Apr 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 10 Dec 2025 — USE AMENDMENT FILED
- 10 Dec 2025 — TEAS STATEMENT OF USE RECEIVED
- 15 Sept 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 14 Aug 2025 — ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
- 10 Jun 2025 — SOU EXTENSION 1 GRANTED
- 10 Jun 2025 — SOU EXTENSION 1 FILED
- 10 Jun 2025 — SOU TEAS EXTENSION RECEIVED
- 10 Dec 2024 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 29 Oct 2024 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Oct 2024 — PUBLISHED FOR OPPOSITION