LIONESS

Live / Allowed — Third extension granted (statement of use) (as of 29 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 26 Sept 2023 filing date already counts against anyone who files later.

Record

Serial number
98197570
Mark type
Word mark
Filed
26 Sept 2023
Published for opposition
04 Feb 2025
Attorney of record
Julian L. Bibb IV

Goods and services

  • Class 009 — Scientific and electric apparatus: Inverters; Inverters for power supply; Power inverters; Photovoltaic inverters; Batteries; Solar batteries; Solar-powered rechargeable batteries; Lithium iron phosphate batteries; Lithium phosphate batteries; Battery packs; Power kits comprising battery packs, USB and DC cables; Solar panels for the production of electricity; Solar panels for the production of electricity for use with electricity generators and portable power generators; Photovoltaic solar panels for the production of electricity; Photovoltaic solar modules for production of electricity; Solar-powered battery chargers; Portable power station kits comprising battery packs, USB and DC cables; Residential smart energy storage systems comprising AC/DC inverter, battery packs, Energy Management System (EMS), DC cable, internet cable, and USB cable; Commercial and large scale energy storage systems comprising an enclosure cabinet or container, AC/DC inverter(s), Battery Rack Module (BRM), Power Distribution Unit (PDU), Energy Management System (EMS), Automatic Transfer Switch (ATS), and Maximize Power Point Tracking (MPPT(s)); Downloadable software application for remotely connecting to a battery, solar generator, portable power products, and energy storage solutions; Battery management systems comprising an enclosure cabinet or container, AC/DC inverter(s), Battery Rack Module (BRM), Power Distribution Unit (PDU), Energy Management System (EMS), Automatic Transfer Switch (ATS), and Maximize Power Point Tracking (MPPT(s)); Energy management systems comprising an enclosure cabinet or container, AC/DC inverter(s), Battery Rack Module (BRM), Power Distribution Unit (PDU), Automatic Transfer Switch (ATS), and Maximize Power Point Tracking (MPPT(s))

Owner

Prosecution history

  • 30 Sept 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 29 Sept 2026 — SOU EXTENSION 3 GRANTED
  • 29 Sept 2026 — SOU EXTENSION 3 FILED
  • 29 Sept 2026 — SOU TEAS EXTENSION RECEIVED
  • 31 Mar 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 31 Mar 2026 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 31 Mar 2026 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 31 Mar 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
  • 31 Mar 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
  • 01 Apr 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 31 Mar 2026 — SOU EXTENSION 2 GRANTED
  • 31 Mar 2026 — SOU EXTENSION 2 FILED
  • 31 Mar 2026 — SOU TEAS EXTENSION RECEIVED
  • 01 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 30 Sept 2025 — SOU EXTENSION 1 GRANTED

View this trademark record on Rightsy