GRAITEC POWERPACK

Live / Allowed — Notice of allowance issued (as of 29 Sept 2026)

What this means for you

Approved and waiting on proof of use. It will register unless the applicant drops it, and its 12 Apr 2023 filing date already counts against anyone who files later.

Record

Serial number
97885535
Mark type
Word mark
Filed
12 Apr 2023
Published for opposition
04 Aug 2026
Attorney of record
Jess M. Collen

Goods and services

  • Class 009 — Scientific and electric apparatus: Downloadable computer software for designing, modeling, detailing, and managing construction and manufacturing projects for use in the field of construction engineering, mechanical, electrical and plumbing engineering and in the field of architectural design for construction projects
  • Class 037 — Building construction and repair services: Consultancy services in the field of construction engineering, mechanical, electrical and plumbing engineering for construction projects
  • Class 041 — Education and entertainment services: Educational and training programs in the field of construction, namely, in the field of construction engineering
  • Class 042 — Scientific and technological services: Software design and development in the field of construction; programming of computer software in the field of construction; providing temporary use of on-line non-downloadable computer software for designing, modeling, detailing, and managing construction and manufacturing projects for use in the field of construction engineering, mechanical, electrical and plumbing engineering and in the field of architectural design for construction projects; consultancy services in the field of architectural design for construction projects

Owner

Prosecution history

  • 29 Sept 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 20 Aug 2026 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 20 Aug 2026 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
  • 20 Aug 2026 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
  • 04 Aug 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 04 Aug 2026 — PUBLISHED FOR OPPOSITION
  • 29 Jul 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 01 Jul 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 26 Jun 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 26 Jun 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 26 Jun 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 26 Mar 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 26 Mar 2026 — NON-FINAL ACTION E-MAILED
  • 26 Mar 2026 — NON-FINAL ACTION WRITTEN
  • 17 Mar 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED

View this trademark record on Rightsy