1 URANUS URANUS O/2 . 1 . ONE
Live / Registered — Registered (as of 18 Aug 2026)
What this means for you
Registered since 18 Aug 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 18 Aug 2032: the §8 declaration of use).
Record
- Serial number
- 97694585
- Registration number
- 8397554
- Mark type
- Design + words
- Filed
- 28 Nov 2022
- Published for opposition
- 19 May 2026
- Registered
- 18 Aug 2026
- Next maintenance filing
- §8 declaration of use, due by 18 Aug 2032 (grace period to 18 Feb 2033)
- Attorney of record
- N. Christopher Norton
Goods and services
- Class 037 — Building construction and repair services: Information, advisory and consulting services in the field of hydrogen-powered transport machinery installation; installation and management of hydrogen-powered transport machinery; construction of hydrogen energy generation facility; installation of hydrogen energy power generation facility; generator repair business services for alternative solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, and hydrogen energy; installation of alternative solar energy generation facility; construction of alternative solar energy generation facility; construction of facility for generation of renewable solar and hydrogen energy; installation of renewable solar energy generation facility; generator repair business services for renewable solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, and hydrogen energy; installation construction services for renewable solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, and hydrogen energy generator; installation, management, and repair of hydrogen power plants; new fuel cell, coal liquefied energy, coal gasification energy, energy from gasification of heavy dust residue, hydrogen energy facility construction; installation of hydrogen energy facility that uses and generates new fuel cell, coal liquefied energy, coal gasification energy, and energy from gasification of heavy dust residue; consulting services related to installation, maintenance and repair of hydrogen generators for chemical processes; provision of information related to installation, maintenance and repair of hydrogen generators for chemical processes; hydrogen refueling services for motor vehicles through hydrogen refueling station management; hydrogen refueling services for motor vehicles through operation of hydrogen refueling stations; repair services for facilities that provide new fuel cell, coal liquefied energy, coal gasification energy, energy from gasification of heavy dust residue, and hydrogen energy; installation of electric control device that uses and generates renewable energy, namely, solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, and hydrogen energy; electrical control equipment repair services for renewable solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, and hydrogen energy; repair business of generators, power converters, inverters and chargers used in renewable solar heat, solar light, hydro power, wind power, waste energy, geothermal energy, hydrogen energy power generation; repair services for facilities that provide renewable solar heat, solar light, biomass, wind energy, small hydro energy, geothermal energy, marine energy, and waste energy; construction of facilities that provide renewable solar heat, solar light, biomass, wind energy, small hydro energy, geothermal energy, marine energy, and waste energy
Owner
- LOWCARBON CO., LTD, Seongjeon-myeon, KR
- LOWCARBON CO., LTD, Seongjeon-myeon, KR
- LOWCARBON CO., LTD, Seongjeon-myeon, KR
Prosecution history
- 18 Aug 2026 — REGISTERED-PRINCIPAL REGISTER
- 24 Jul 2026 — 1(B) BASIS DELETED; PROCEED TO REGISTRATION
- 24 Jul 2026 — NOTICE OF ALLOWANCE CANCELLED
- 14 Jul 2026 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 08 Jul 2026 — POST PUBLICATION AMENDMENT - ENTERED
- 08 Jul 2026 — ASSIGNED TO PETITION STAFF
- 19 May 2026 — TEAS POST PUBLICATION AMENDMENT RECEIVED
- 19 May 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 19 May 2026 — PUBLISHED FOR OPPOSITION
- 13 May 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 May 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 20 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 20 Apr 2026 — EXAMINER'S AMENDMENT ENTERED
- 20 Apr 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 20 Apr 2026 — EXAMINERS AMENDMENT E-MAILED