W51 HD
Live / Allowed — Fourth extension granted (statement of use) (as of 04 Jun 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 08 Nov 2022 filing date already counts against anyone who files later.
Record
- Serial number
- 97668907
- Mark type
- Word mark
- Filed
- 08 Nov 2022
- Published for opposition
- 09 Apr 2024
- Attorney of record
- Alexander Lazouski
Goods and services
- Class 007 — Machines and machine tools: Electric motors for industrial machines and structural and replacements parts therefor; permanent magnet motors and electrical motors, other than for land vehicles; electric motors not for land vehicles; pump motors for commercial, industrial and residential applications and structural and replacement parts therefor; DC and synchronous motors and structural and replacement parts therefor; fractional motors, namely, motors with fractional powers for pumps, ventilation systems, extraction of juice and not for land vehicles; explosion proof electric motors not for land vehicles; high efficiency electric motors not for land vehicles; severe duty and general purpose electric motors not for land vehicles; low voltage electric motors not for land vehicles; medium voltage electric motors not for land vehicles; high voltage electric motors not for land vehicles; slip ring motors not for land vehicles; induction motors not for land vehicles; machine parts being bearings; axial machines, stators being parts of machines; coils for machines, namely, windings for machines; headstock in the nature of parts of motors; ring lubrication in the nature of parts of machine and engine, namely, machine and ring for lubrication; integral frame alternating current electric motors for machines; electrical generators, turbogenerators and hydrogenerators; variable frequency drives, namely, variable speed drives, frequency inverters to control the speed and torque of electric motors
Owner
Prosecution history
- 05 Jun 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Jun 2026 — SOU EXTENSION 4 GRANTED
- 04 Jun 2026 — SOU EXTENSION 4 FILED
- 05 Jun 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 05 Jun 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Jun 2026 — SOU TEAS EXTENSION RECEIVED
- 04 Jun 2026 — SOU EXTENSION 3 GRANTED
- 04 Dec 2025 — SOU EXTENSION 3 FILED
- 04 Jun 2026 — SOU EXTENSION 2 GRANTED
- 04 Jun 2025 — SOU EXTENSION 2 FILED
- 04 Jun 2026 — NOTICE OF REVIVAL - E-MAILED
- 04 Jun 2026 — PETITION TO REVIVE DISMISSED
- 04 Jun 2026 — SOU EXTENSION RECEIVED WITH TEAS PETITION
- 04 Jun 2026 — TEAS PETITION TO REVIVE RECEIVED
- 16 Dec 2025 — NOTICE OF REVIVAL - E-MAILED