KORD
Live / Applied — Statement of use — response to non-final action entered (as of 15 Oct 2026)
What this means for you
Not registered yet, but its 06 Oct 2022 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 97621142
- Mark type
- Word mark
- Filed
- 06 Oct 2022
- Published for opposition
- 15 Oct 2024
- Attorney of record
- Dyan M. House
Goods and services
- Class 009 — Scientific and electric apparatus: (Based on Intent to Use) Defense system comprised of power management controllers, thermal and laser management controllers, high-capacity batteries, laser-beam directors, electronic devices combining laser and beam technologies, downloadable software, guided projectiles, GPS tracking devices, and cameras, for tracking and destroying drones and other non-piloted aircraft
- Class 042 — Scientific and technological services: (Based on Use in Commerce) Consultation and research in the field of aerospace engineering; Design and development of defense systems targeting drones and other non-piloted aircraft; Engineering consultation and design services for missile systems, high energy laser systems, aerospace vehicles, defense systems, cyber security support systems, and advanced hypersonic and rotary wing computational fluid dynamics; Engineering services in the field of aerospace engineering, defense technologies, training, and logistics, and cyber security support
Owner
- Kord Technologies, LLC, Houston, TX, US
- Kord Technologies, LLC, Houston, TX, US
Prosecution history
- 15 Oct 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 15 Oct 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 15 Oct 2026 — ASSIGNED TO LIE
- 13 Oct 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 13 Jul 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 13 Jul 2026 — NON-FINAL ACTION E-MAILED
- 13 Jul 2026 — SU - NON-FINAL ACTION - WRITTEN
- 13 Jul 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 13 Jul 2026 — NON-FINAL ACTION E-MAILED
- 13 Jul 2026 — SU - NON-FINAL ACTION - WRITTEN
- 12 May 2026 — STATEMENT OF USE PROCESSING COMPLETE
- 30 Dec 2025 — USE AMENDMENT FILED
- 30 Dec 2025 — TEAS STATEMENT OF USE RECEIVED
- 08 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 07 Jul 2025 — SOU EXTENSION 1 GRANTED