B.A.X BUILDING AUTOMATION EXPANDED
Live / Allowed — Fifth extension granted (statement of use) (as of 05 Oct 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 13 Jul 2022 filing date already counts against anyone who files later.
Record
- Serial number
- 97501668
- Mark type
- Slogan / phrase
- Filed
- 13 Jul 2022
- Published for opposition
- 09 Jan 2024
- Attorney of record
- Michael Catania
Goods and services
- Class 009 — Scientific and electric apparatus: downloadable computer software for the on-site and remote monitoring, control, operation, automation, and optimization of, and interaction with, building, facility, and power plant devices, apparatus and systems for heating, air conditioning, ventilation, refrigeration, energy use, allocation, maintenance, efficiency and stabilization; electrical controlling devices; Electric control devices for energy management systems and security systems; Automation process control systems comprising of wireless and wired controllers and downloadable software for automating appliances, lighting, and HVAC ;electronic control devices and automation process control systems comprising wireless and wired controllers, and recorded software for building, facility and power plant environmental, water flow or energy control systems; electronic control devices and automation process control systems comprising of wireless and wired controllers, and recorded software for the on-site and remote monitoring, control, operation, automation, and optimization of, and interaction with, building, facility, and power plant devices, apparatus and systems for heating, air conditioning, ventilation, energy use, water flow, moisture detection, or equipment and systems fault detection; computer hardware, recorded software, electronic sensors, monitors, and electronic controls, for individual and integrated on-site and remote monitoring, control, operation, automation and optimization of, and interaction with, building, facility and power plant devices, apparatus and systems for heating, air conditioning, ventilation, refrigeration, energy use or water flow to be used onsite and in the field; automated process control systems comprised of computer hardware, downloadable software and wireless and wired controllers and controlled devices for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data; automated process control systems comprised of wireless and wired controllers for gathering, collecting, aggregating, storing, analyzing, and reporting data; computer hardware and recorded software for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data from building, facility, and power plant controls for, environmental, water flow, energy, or automation and optimization devices; Electrical controlling systems comprised of recorded software, wireless and wired controllers and controlled devices for gathering, collecting, aggregating, storing, sorting, analyzing and reporting data from building, facility and plant devices, monitors, monitoring systems, sensors, controls, control systems, and apparatus for heating, air conditioning, ventilation, refrigeration, energy use, energy allocation, maintenance, energy efficiency, water flow and moisture detection; computer hardware and recorded software system for wired and wireless networking controls of building, facility and power plant controls of environmental systems
Owner
- Best Energy Reduction Technologies, LLC, King of Prussia, PA, US
- Best Energy Reduction Technologies, LLC, King of Prussia, PA, US
Prosecution history
- 06 Oct 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 05 Oct 2026 — SOU EXTENSION 5 GRANTED
- 01 Sept 2026 — SOU EXTENSION 5 FILED
- 05 Oct 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 01 Sept 2026 — SOU TEAS EXTENSION RECEIVED
- 25 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Feb 2026 — SOU EXTENSION 4 GRANTED
- 24 Feb 2026 — SOU EXTENSION 4 FILED
- 24 Feb 2026 — SOU TEAS EXTENSION RECEIVED
- 27 Aug 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 26 Aug 2025 — SOU EXTENSION 3 GRANTED
- 26 Aug 2025 — SOU EXTENSION 3 FILED
- 26 Aug 2025 — SOU TEAS EXTENSION RECEIVED
- 24 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Feb 2025 — SOU EXTENSION 2 GRANTED