RPLUS HYDRO
Live / Allowed — Fourth extension granted (statement of use) (as of 30 Jul 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 18 Aug 2021 filing date already counts against anyone who files later.
Record
- Serial number
- 90889558
- Mark type
- Word mark
- Filed
- 18 Aug 2021
- Published for opposition
- 30 Apr 2024
- Attorney of record
- Catherine Parrish Lake
Goods and services
- Class 037 — Building construction and repair services: Installation, repair and maintenance of renewable energy generation equipment; Construction, repair, maintenance and installation services for hydroelectric power plants; Installation, construction, maintenance and repair of transmission facilities, energy equipment, and energy systems; Maintenance and repair of the electrical or mechanical systems of others to eliminate or reduce electric power interruptions, fluctuations, transients, and harmonics; Power plant construction; all of the foregoing excluding oil and gas well, and oilfield services
- Class 039 — Transportation and storage services: Consultation in the field of energy transmission and distribution; Utility services, namely, transmission of electric power in the nature of renewable energy, in particular hydroelectric energy; all of the foregoing excluding oil and gas well, and oilfield services
- Class 040 — Treatment of materials: Production, conversion, inversion, transformation and conditioning of renewable energy, in particular into electricity from hydropower energy; Generation of electric power in the nature of renewable energy, namely, hydroelectric energy; all of the foregoing excluding oil and gas well, and oilfield services
Owner
- rPlus Energies, LLC, Salt Lake City, UT, US
- rPlus Energies, LLC, Salt Lake City, UT, US
Prosecution history
- 31 Jul 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Jul 2026 — SOU EXTENSION 4 GRANTED
- 18 May 2026 — SOU EXTENSION 4 FILED
- 18 May 2026 — SOU TEAS EXTENSION RECEIVED
- 20 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 19 Jan 2026 — SOU EXTENSION 3 GRANTED
- 13 Nov 2025 — SOU EXTENSION 3 FILED
- 14 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 28 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 28 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Oct 2025 — SOU EXTENSION 2 GRANTED
- 25 Jun 2025 — SOU EXTENSION 2 FILED
- 27 Oct 2025 — SOU EXTENSION 1 GRANTED
- 19 Dec 2024 — SOU EXTENSION 1 FILED
- 27 Oct 2025 — CORRECTED NOA E-MAILED