ABOVE ALL EQUIPMENT
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 12 Sept 2024)
What this means for you
Registered since 30 Oct 2018. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 30 Oct 2028: the §8 & §9 renewal).
Record
- Serial number
- 87727398
- Registration number
- 5593960
- Mark type
- Word mark
- Filed
- 19 Dec 2017
- Published for opposition
- 14 Aug 2018
- Registered
- 30 Oct 2018
- Next maintenance filing
- §8 & §9 renewal, due by 30 Oct 2028 (grace period to 30 Apr 2029)
- Attorney of record
- Colleen Flynn Goss
Goods and services
- Class 007 — Machines and machine tools: Excavating machines; Skid-steer loaders; Earth moving machines, namely, excavators; Elevating or lifting work platforms; Hydraulic excavators; Hydraulic motors for excavators; Mechanical and hydraulic lifts; Power-operated lifting and moving equipment, namely, pipe layers, fork lifts, telehandlers, and lifts [ ; Replacement parts for machines, namely, replacement parts for trench excavators, drag-line excavators, hoisting machines, locomotive cranes, shoveling machines, power shovels and log handling machines, namely, chassis parts, hydraulic and pneumatic parts; Rubber tracks being parts of excavating machines; Rubber tracks being parts of skid-steer loaders; Tire chains and over-the-tire track systems for skid-steer loaders and other construction machinery; Wheel loaders ]
Owner
- Above All Equipment, Inc., Avon, OH, US
- Above All Equipment, Inc., Avon, OH, US
- Above All Equipment, Inc., Avon, OH, US
Prosecution history
- 12 Sept 2024 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 12 Sept 2024 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 12 Sept 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 29 Feb 2024 — TEAS SECTION 8 & 15 RECEIVED
- 30 Oct 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 30 Oct 2018 — REGISTERED-PRINCIPAL REGISTER
- 14 Aug 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Aug 2018 — PUBLISHED FOR OPPOSITION
- 25 Jul 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 29 Jun 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 05 Jun 2018 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 04 Jun 2018 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 04 Jun 2018 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 03 Apr 2018 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 03 Apr 2018 — NON-FINAL ACTION E-MAILED