S U SUMTER UTILITIES

Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 28 Apr 2025)

What this means for you

Registered since 05 Jun 2018. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 05 Jun 2028: the §8 & §9 renewal).

Record

Serial number
87574735
Registration number
5484356
Mark type
Design + words
Filed
18 Aug 2017
Published for opposition
20 Mar 2018
Registered
05 Jun 2018
Next maintenance filing
§8 & §9 renewal, due by 05 Jun 2028 (grace period to 05 Dec 2028)
Attorney of record
Mark Oathout

Goods and services

  • Class 037 — Building construction and repair services: Construction project management services; Construction of electric power infrastructure, electrical transmission lines and distribution voltage lines, underground utilities, boreholes, outdoor lighting, substations, and solar power cell fields; Electrical contracting; Installation, maintenance and repair of electric power infrastructure, electrical transmission lines and distribution voltage lines, underground utilities, boreholes, outdoor lighting, substations, and solar power cell fields
  • Class 042 — Scientific and technological services: Engineering services in the field of electric power infrastructure; Technological planning and consulting services in the field of electric power infrastructure

Owner

Prosecution history

  • 20 May 2025 — NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
  • 28 Apr 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
  • 28 Apr 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
  • 28 Apr 2025 — AMENDMENT UNDER SECTION 7 - PROCESSED
  • 21 Apr 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 03 Dec 2024 — TEAS SECTION 8 & 15 RECEIVED
  • 03 Dec 2024 — TEAS SECTION 7 REQUEST RECEIVED
  • 05 Jun 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 05 Jun 2018 — REGISTERED-PRINCIPAL REGISTER
  • 20 Mar 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 20 Mar 2018 — PUBLISHED FOR OPPOSITION
  • 28 Feb 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 05 Feb 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 31 Jan 2018 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 30 Jan 2018 — CORRESPONDENCE RECEIVED IN LAW OFFICE

View this trademark record on Rightsy