GOTION
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 22 Mar 2024)
What this means for you
Registered since 10 Oct 2017. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (the §8 & §9 renewal is due by 10 Oct 2027, and its filing window is open now).
Record
- Serial number
- 87257909
- Registration number
- 5308318
- Mark type
- Design + words
- Filed
- 05 Dec 2016
- Published for opposition
- 18 Apr 2017
- Registered
- 10 Oct 2017
- Next maintenance filing
- §8 & §9 renewal, due by 10 Oct 2027 (grace period to 10 Apr 2028)
- Attorney of record
- Victoria Friedman
Goods and services
- Class 009 — Scientific and electric apparatus: Batteries, electric, for vehicles; Battery packs; Electric batteries for powering electric vehicles; Lithium ion batteries
- Class 042 — Scientific and technological services: Product design and development in the field of lithium ion battery systems and electric vehicles; Product design and development in the field of energy storage system; Product design and development in the field of electric vehicles power-train control system; Research and development of technology in the field of lithium ion battery systems and electric vehicles; Research and development of technology in the field of energy storage system; Research and development of technology in the field of electric vehicles power-train control system; Product research and development
Owner
- Gotion Inc., Fremont, CA, US
- Gotion Inc., Fremont, CA, US
- Gotion Inc., Fremont, CA, US
Prosecution history
- 10 Oct 2026 — COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
- 22 Mar 2024 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 22 Mar 2024 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 22 Mar 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 28 Sept 2023 — TEAS SECTION 8 & 15 RECEIVED
- 10 Oct 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 10 Oct 2017 — REGISTERED-PRINCIPAL REGISTER
- 06 Sept 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 05 Sept 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 17 Aug 2017 — STATEMENT OF USE PROCESSING COMPLETE
- 24 Jul 2017 — USE AMENDMENT FILED
- 17 Aug 2017 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 24 Jul 2017 — TEAS STATEMENT OF USE RECEIVED
- 13 Jun 2017 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 18 Apr 2017 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED