WALKER ENGINEERING
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 23 Aug 2023)
What this means for you
Registered since 11 Jul 2017. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (the §8 & §9 renewal is due by 11 Jul 2027, and its filing window is open now).
Record
- Serial number
- 87168455
- Registration number
- 5242974
- Mark type
- Design + words
- Filed
- 12 Sept 2016
- Published for opposition
- 07 Feb 2017
- Registered
- 11 Jul 2017
- Next maintenance filing
- §8 & §9 renewal, due by 11 Jul 2027 (grace period to 11 Jan 2028)
- Attorney of record
- Molly Buck Richard
Goods and services
- Class 037 — Building construction and repair services: Electrical contracting; installation of networking hardware; installation of security systems; installation of audio, visual and lighting systems
- Class 040 — Treatment of materials: Contract manufacturing in the field of industrial control panels and wiring assemblies
- Class 042 — Scientific and technological services: Computer aided design for others; design of audio, visual and lighting systems
Owner
- Walker Engineering, Inc., Irving, TX, US
- Walker Engineering, Inc., Irving, TX, US
- Walker Engineering, Inc., Irving, TX, US
Prior registrations
Prosecution history
- 11 Jul 2026 — COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
- 12 Sept 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 12 Sept 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 12 Sept 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 23 Aug 2023 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 23 Aug 2023 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 23 Aug 2023 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 23 Feb 2023 — TEAS SECTION 8 & 15 RECEIVED
- 11 Jul 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 30 Apr 2018 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 11 Jul 2017 — REGISTERED-PRINCIPAL REGISTER
- 09 Jun 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 08 Jun 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 12 May 2017 — STATEMENT OF USE PROCESSING COMPLETE
- 17 Apr 2017 — USE AMENDMENT FILED