GEOBASICS
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 28 Apr 2026)
What this means for you
Registered since 04 Sept 2018. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 04 Sept 2028: the §8 & §9 renewal).
Record
- Serial number
- 87010571
- Registration number
- 5556230
- Mark type
- Word mark
- Filed
- 22 Apr 2016
- Published for opposition
- 02 May 2017
- Registered
- 04 Sept 2018
- Next maintenance filing
- §8 & §9 renewal, due by 04 Sept 2028 (grace period to 04 Mar 2029)
- Attorney of record
- Jeffrey R. Kuester
Goods and services
- Class 006 — Metal goods: Geotechnical construction products, namely, foundation support devices made of metal for supporting structural components in tension and compression, [ seepage control devices made of metal for routing water to specific positions within excavation support, ] tension bolt adapters made of metal for placing foundation support elements in tension, [ horizontal helical drains made of metal for relieving trapped hydrostatic pressure behind retaining walls and in slope stabilization applications that are susceptive to slides, instant helical wells made of metal used to monitor water for possible soil contamination and to obtain water supply in shallow well applications, direct torque well devices made of metal, jetted helical piles made of metal, ] and crawlspace foundation supports made of metal for flooring systems
Owner
- Geobasics, LLC, Marietta, GA, US
- Geobasics, LLC, Marietta, GA, US
- Geobasics, LLC, Marietta, GA, US
Prosecution history
- 28 Apr 2026 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 28 Apr 2026 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 28 Apr 2026 — OFFICE ACTION ISSUED- NO RESPONSE REQUIRED POU
- 22 Apr 2026 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 21 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 21 Oct 2025 — OFFICE ACTION ISSUED POU2
- 14 Oct 2025 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 23 Apr 2025 — OFFICE ACTION ISSUED POU1
- 15 Apr 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 14 Jan 2025 — TEAS SECTION 8 & 15 RECEIVED
- 04 Sept 2018 — REGISTERED-PRINCIPAL REGISTER
- 03 Aug 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE MAILED
- 02 Aug 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 19 Jul 2018 — STATEMENT OF USE PROCESSING COMPLETE
- 27 Jun 2018 — USE AMENDMENT FILED