GENEUSCONVERT
Live / Applied — Non-final action mailed (as of 30 Sept 2026)
Now
Refused for now — an office action was mailed 30 Sept 2026.
A response is due by 30 Mar 2027; with no response the application is abandoned.
What this means for you
Not registered yet, but its 07 Apr 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79454261
- Mark type
- Design + words
- Filed
- 07 Apr 2026
Goods and services
- Class 009 — Scientific and electric apparatus: Electric current transformers for aircraft; electric grid converters for aircraft; voltage converter for aircraft; electric conversion system for aircraft; electric conversion equipment for aircraft; testing devices for aircraft electronics; electric regulating apparatus for aircraft; measuring, detecting, monitoring and controlling apparatus for aircraft.
- Class 037 — Building construction and repair services: Repair, overhaul, reconditioning, adaptation, modification, servicing and maintenance of electric and electronic apparatus, instruments, systems, material and equipment for use in the aeronautical and defense fields.
- Class 042 — Scientific and technological services: Quality control, authentication and testing; development of energy and electricity management systems for aircraft; scientific and technological services; scientific and technological services and advisory services in relation to the following goods: electric current transformers for aircraft, electric grid converters for aircraft, voltage converters for aircraft, electric conversion systems for aircraft, electric conversion equipment for aircraft, testing devices for aircraft electronics, electric regulating apparatus for aircraft, measuring, detecting, monitoring and controlling apparatus for aircraft.
Owner
Prosecution history
- 15 Oct 2026 — REFUSAL PROCESSED BY IB
- 30 Sept 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 30 Sept 2026 — REFUSAL PROCESSED BY MPU
- 25 Jul 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 24 Jul 2026 — NON-FINAL ACTION WRITTEN
- 17 Jul 2026 — ASSIGNED TO EXAMINER
- 16 Jul 2026 — APPLICATION FILING RECEIPT MAILED
- 16 Jul 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Jul 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB