A.ENERGY
Live / Allowed — Publication / registration review complete (as of 12 Nov 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 05 May 2026 filing date already counts against anyone who files later.
Record
- Serial number
- 79452969
- Mark type
- Design + words
- Filed
- 05 May 2026
- Published for opposition
- 01 Dec 2026
- Attorney of record
- Max Vern
Goods and services
- Class 035 — Advertising and business services: Business management and administration; business management consultancy; business organization consultancy; negotiation and conclusion of commercial transactions for third parties; business project management services for construction projects; negotiation of business contracts for others; cost management of construction projects
- Class 037 — Building construction and repair services: Construction services, namely, construction of industrial buildings; construction of industrial buildings; underwater construction; building construction supervision; factory construction; pipeline construction and maintenance; providing construction information; construction consultancy; installation of utilities in construction sites
- Class 039 — Transportation and storage services: Transport of goods by air, boat, rail; packaging and storage of goods; car transport; trucking services, namely, hauling of industrial equipment, construction materials, and tools; storage of industrial equipment, construction materials, and tools; ferryboat transport; river transport by ship; freight being shipping of goods; freighting services; boat transport; freight forwarding; marine transport; providing transportation information; transportation logistics, namely, storage, transportation and delivery of goods for others by air, rail, ship or truck; barge transport; transport of captured carbon dioxide for others; storage of captured carbon dioxide for others
- Class 042 — Scientific and technological services: Scientific and technological services, namely, scientific research and analysis, in the field of industrial construction, oil and natural gas processing technologies; scientific research in the field of industrial construction, oil and natural gas processing technologies and design relating thereto; industrial analysis, industrial research and industrial design services in the field of industrial construction, oil and natural gas processing technologies; quality control and authentication services in the field of industrial construction; design and development of computer hardware and software; architectural services; architectural consultancy; drafting construction plans; technological research in the field of industrial construction, oil and natural gas processing technologies conducting technical project studies in the field of oil and natural gas processing technologies; geological surveys; engineering; computer software design; rental of computer software for industrial construction, oil and natural gas processing technologies; engineering surveying; computer system design; computer software consultancy; providing scientific information, advice and consultancy relating to carbon offsetting; energy auditing; software as a service (SAAS) services featuring software for use in the field of industrial construction, oil and natural gas processing technologies; technological consultancy in the technology field of oil and natural gas processing technologies; technical writing; research in the field of building construction; design of computer-simulated models
Owner
Prosecution history
- 03 Nov 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 27 Oct 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 27 Oct 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 27 Oct 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 22 Oct 2026 — REFUSAL PROCESSED BY IB
- 07 Oct 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Oct 2026 — REFUSAL PROCESSED BY MPU
- 01 Aug 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 31 Jul 2026 — NON-FINAL ACTION WRITTEN
- 24 Jul 2026 — ASSIGNED TO EXAMINER
- 30 Jun 2026 — APPLICATION FILING RECEIPT MAILED
- 30 Jun 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Jun 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB