PDT
Live / Applied — Response to non-final action entered (as of 16 Nov 2026)
What this means for you
Not registered yet, but its 13 Apr 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79452124
- Mark type
- Word mark
- Kind
- Service mark
- Register
- Principal
- Basis
- Madrid Protocol (§66(a))
- International registration
- 1922841
- Filed
- 13 Apr 2026
- Examining attorney
- Samantha Agreda
- Attorney of record
- Jason R. Lee
Goods and services
- Class 037 — Building construction and repair services: Inspection services of offshore platforms, production facilities, processing plants, refineries, terminals, service stations and other industrial installations, as well as independent transportation infrastructure such as major oil pipelines and gas pipelines, prior to maintenance and repair of structures and other physical assets similar to structures, namely pipes, vessels, tanks, platforms, turbines, rotating equipment and valves
- Class 042 — Scientific and technological services: Scientific and technological services and technical inspection services for buildings, structures and vehicles, covering offshore platforms, production facilities, processing plants, refineries, terminals, service stations and other industrial installations, as well as independent transportation infrastructure such as major oil pipelines and gas pipelines, all related to the fields of overall structural integrity, assessment of the condition of buildings and structures, facility management, and structural analysis to determine the physical condition of structures and other physical assets similar to structures, namely, pipes, vessels, tanks, platforms, turbines, rotating equipment and valves
Owner
Prosecution history
- 19 Nov 2026 — REFUSAL PROCESSED BY IB
- 16 Nov 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 16 Nov 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 16 Nov 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 05 Nov 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 04 Nov 2026 — REFUSAL PROCESSED BY MPU
- 26 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 25 Jun 2026 — NON-FINAL ACTION WRITTEN
- 25 Jun 2026 — ASSIGNED TO EXAMINER
- 24 Jun 2026 — APPLICATION FILING RECEIPT MAILED
- 24 Jun 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 18 Jun 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB