NCO

Live / Applied — Non-final action mailed (as of 15 Aug 2026)

What this means for you

Not registered yet, but its 23 Feb 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
79448175
Mark type
Stylized text
Filed
23 Feb 2026

Goods and services

  • Class 007 — Machines and machine tools: Industrial automation machinery; industrial metalworking plant; metalworking machines; rolling mills; apparatus for the cooling and treatment of rolled products; parts and spare parts for steel plants.
  • Class 009 — Scientific and electric apparatus: Industrial computer software; software for the automation and control of industrial plant; software for the supervision and monitoring of rolling processes; diagnostic, predictive maintenance and data analysis software; software for the integration of industrial control sensors and systems.
  • Class 037 — Building construction and repair services: Installation and putting into service of industrial plant; testing and commissioning of steel plants; ordinary and extraordinary maintenance of industrial machinery; technical assistance relating to industrial plant and machines; repair and servicing of mechanical components; replacement and upgrading of parts of industrial plant; remote monitoring of industrial plant.
  • Class 040 — Treatment of materials: Working and processing of metals; technical and mechanical treatment of metals; custom manufacture of parts for steel plants; machining parts for others.
  • Class 042 — Scientific and technological services: Design and engineering of steel plants; mechanical, electrical and engineering design; development of industrial automation solutions; technical consultancy relating to the optimisation of rolling processes; research and development relating to metalworking technologies; 3D modelling and simulation of installations; technical and energy feasibility studies; design and development of software for industrial automation; structural and engineering analysis of mechanical components.

Owner

Prosecution history

  • 03 Sept 2026 — REFUSAL PROCESSED BY IB
  • 15 Aug 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 15 Aug 2026 — REFUSAL PROCESSED BY MPU
  • 13 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 12 Jun 2026 — NON-FINAL ACTION WRITTEN
  • 11 Jun 2026 — ASSIGNED TO EXAMINER
  • 22 Apr 2026 — APPLICATION FILING RECEIPT MAILED
  • 22 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 16 Apr 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB

View this trademark record on Rightsy