GENERALFUSION
Live / Applied — Non-final action mailed (as of 01 Aug 2026)
What this means for you
Not registered yet, but its 26 Feb 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79448174
- Mark type
- Stylized text
- Filed
- 26 Feb 2026
Goods and services
- Class 007 — Machines and machine tools: Nuclear fusion power generators.
- Class 009 — Scientific and electric apparatus: Plasma generator for scientific, research and development purposes; plasma injector for scientific, research and development purposes; plasma accelerator for scientific, research and development purposes; nuclear fusion reactor for scientific, research and development purposes; plasma generator for plasma physics research; nuclear fusion reactor for plasma physics research; nuclear gauges used for measuring the physical properties of matter.
- Class 011 — Environmental control apparatus: Nuclear power plants; nuclear generators; nuclear reactors; nuclear reactor pressure vessels; installations for processing nuclear fuel and nuclear moderating material; nuclear fusion energy reactor and reactor subcomponents.
- Class 037 — Building construction and repair services: Installation, maintenance and repair of nuclear fusion based power plants; providing information relating to the repair or maintenance of nuclear power plants; consulting services in the field of construction of nuclear fusion power facilities; construction of nuclear fusion power plants; installation, maintenance and repair of energy generation equipment.
- Class 040 — Treatment of materials: Providing technical information in the field of power generation; consultation in the field of custom fabrication of nuclear fusion energy reactors and reactor subcomponents.
- Class 042 — Scientific and technological services: Research and development in the field of nuclear energy; project design development in the field of nuclear fusion energy reactors, reactor subcomponents, and nuclear fusion energy systems; nuclear engineering; research and development in the field of energy transfer performance.
Owner
Prosecution history
- 20 Aug 2026 — REFUSAL PROCESSED BY IB
- 01 Aug 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 01 Aug 2026 — REFUSAL PROCESSED BY MPU
- 17 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 16 Jun 2026 — NON-FINAL ACTION WRITTEN
- 12 Jun 2026 — ASSIGNED TO EXAMINER
- 22 Apr 2026 — APPLICATION FILING RECEIPT MAILED
- 22 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Apr 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB