PENTACK
Live / Applied — Non-final action mailed (as of 29 Jul 2026)
Now
Refused for now — an office action was mailed 29 Jul 2026.
A response is due by 29 Jan 2027; with no response the application is abandoned.
What this means for you
Not registered yet, but its 12 Feb 2026 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79447986
- Mark type
- Word mark
- Filed
- 12 Feb 2026
Goods and services
- Class 019 — Non-metallic building materials: Asphalt, pitch and bitumen; cold processable asphalt (bitumen) emulsion for road building purposes (repair, surface treatment and penetration of mixing constructions), also for applying protective layers on foundations, sewerage, constructions made of concrete, walls to protect against damp and acids; recycled bitumen, inter alia used as an asphalt binding agent in civil engineering, in hydraulic engineering seals, and as a coating for waterproofing membranes; bitumen, in particular modified bitumen used in road construction; tar and tar products.
Owner
Prosecution history
- 13 Aug 2026 — REFUSAL PROCESSED BY IB
- 29 Jul 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 29 Jul 2026 — REFUSAL PROCESSED BY MPU
- 08 Jun 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 07 Jun 2026 — NON-FINAL ACTION WRITTEN
- 05 Jun 2026 — ASSIGNED TO EXAMINER
- 22 Apr 2026 — APPLICATION FILING RECEIPT MAILED
- 22 Apr 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 16 Apr 2026 — SN ASSIGNED FOR SECT 66A APPL FROM IB