GRAPHISOFT MEP DESIGNER
Live / Registered — Registered (as of 29 Sept 2026)
What this means for you
Registered since 29 Sept 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 29 Sept 2032: the §71 affidavit of use).
Record
- Serial number
- 79447160
- Registration number
- 8465871
- Mark type
- Design + words
- Filed
- 19 Dec 2025
- Published for opposition
- 11 Aug 2026
- Registered
- 29 Sept 2026
- Next maintenance filing
- §71 affidavit of use, due by 29 Sept 2032 (grace period to 29 Mar 2033)
- Attorney of record
- Priscilla Lauren Speer
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable or recorded software for building information modeling, computer aided design, architectural design, engineering project planning, construction project coordination, and mechanical, electrical and plumbing systems design in the fields of architecture, engineering and construction; downloadable or recorded architectural and modeling computer software for building information modeling and computer aided design; downloadable or recorded computer software for designing building components and for the design, documentation and construction of buildings; downloadable electronic publications, namely, digital documents in the field of architecture downloadable from a website; downloadable or recorded computer software for architecture, mechanical engineering, electrical engineering and plumbing engineering; computer software platforms, recorded or downloadable, for building information modeling, computer aided design, architectural design, engineering project planning, construction project coordination, and mechanical, electrical and plumbing systems design in the fields of architecture, engineering and construction; recorded computer programs for building information modeling, computer aided design, architectural design, engineering project planning, construction project coordination, and mechanical, electrical and plumbing systems design; downloadable computer software applications for building information modeling, computer aided design, architectural design, engineering project planning, construction project coordination, and mechanical, electrical and plumbing systems design
- Class 042 — Scientific and technological services: Design planning of buildings; graphic arts design; computer aided design services; architectural services for the preparation of architectural plans; architectural planning and consultancy; software development services; server hosting; server administration services, namely, server hosting in relation to architectural design and architectural modeling; hosting of digital content on the internet; hosting of computer websites that provide information on architecture; hosting of computer platforms featuring online real-time collaboration environments for the architecture, engineering and construction industry; server hosting for providing online collaborative environments for use in relation to the fields of architecture, engineering and building construction; providing online non-downloadable computer software for building information modelling, computer aided design, architectural design, engineering project planning, construction project coordination, and mechanical, electrical and plumbing systems design in the fields of architecture, engineering and construction; computer programming; architectural design
Owner
- Graphisoft SE, HU
- Graphisoft SE, HU
- Graphisoft SE, HU
Prosecution history
- 29 Sept 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 29 Sept 2026 — REGISTERED-PRINCIPAL REGISTER
- 11 Aug 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 11 Aug 2026 — PUBLISHED FOR OPPOSITION
- 05 Aug 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 Jul 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 06 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 06 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 06 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 25 Jun 2026 — REFUSAL PROCESSED BY IB
- 05 Jun 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 05 Jun 2026 — REFUSAL PROCESSED BY MPU
- 24 Apr 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 23 Apr 2026 — NON-FINAL ACTION WRITTEN
- 22 Apr 2026 — ASSIGNED TO EXAMINER