VSH
Live / Allowed — Published for opposition (as of 22 Sept 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 19 Sept 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79445662
- Mark type
- Word mark
- Filed
- 19 Sept 2025
- Published for opposition
- 22 Sept 2026
- Attorney of record
- Farzad A. Panjshiri
Goods and services
- Class 006 — Metal goods: Raw and semi-finished base metals and their alloys; anchors, rolled and cast for use as building materials; metal pipes; steel balls; screws and other goods made of metal, including accessories for beer tap installations, gas, water, and central heating pipes, namely, couplings, connectors, and fittings; couplings and connectors, namely, metal turning tools; solder fittings and compression fittings being hog rings: metal parts, namely, snap locks, profile slides, screws, nuts, and other metal fasteners for pipes and fittings for use in plumbing, heating, gas, and water installations
- Class 009 — Scientific and electric apparatus: Accessories for beer dispensing systems and for gas, water, and central heating pipes, namely pressure gauges and level gauges.
- Class 011 — Environmental control apparatus: Lighting, cooking, cooling, drying, ventilation, water supply, gas, and sanitary installations, parts therefor, and accessories for these installations therefor, namely, ball valves, safety steam relief valves, globe valves, dynamic balancing valves, needle valves, mixing valves, check valves, gate valves; fittings for gas, water, and central heating pipes, namely taps
- Class 017 — Rubber goods: Fittings for beer dispensing systems and for gas, water, and central heating pipes, namely, non-metallic couplings and connectors; non-metallic hoses and flexible pipes
Owner
Prosecution history
- 22 Sept 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 22 Sept 2026 — PUBLISHED FOR OPPOSITION
- 16 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 28 Aug 2026 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 28 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Aug 2026 — EXAMINER'S AMENDMENT ENTERED
- 28 Aug 2026 — EXAMINERS AMENDMENT E-MAILED
- 28 Aug 2026 — EXAMINERS AMENDMENT -WRITTEN
- 18 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 18 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 18 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 09 Jul 2026 — NEW REPRESENTATIVE AT IB RECEIVED
- 14 May 2026 — REFUSAL PROCESSED BY IB
- 29 Apr 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 29 Apr 2026 — REFUSAL PROCESSED BY MPU