DEHYDRIS
Live / Allowed — Publication / registration review complete (as of 29 Oct 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 15 Dec 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79440799
- Mark type
- Word mark
- Filed
- 15 Dec 2025
- Published for opposition
- 17 Nov 2026
- Attorney of record
- Ee Ming T. Bahk
Goods and services
- Class 011 — Environmental control apparatus: Sludge treatment equipment and installations for urban and industrial wastewater plants, namely, sludge dehydration equipment in the nature of vacuum filters, belt pressure filters, filter presses, sand filters and dewatering machines, all of the foregoing for wastewater treatment
- Class 037 — Building construction and repair services: Building, installation, commissioning, maintenance and repair services for waste treatment equipment and installations, particularly for plants treating sludge from urban and industrial wastewater
- Class 040 — Treatment of materials: Conversion of sludge from urban and industrial wastewater treatment plants into energy, fuel, organic soil conditioners for use in agriculture and inert products, namely, ash, vitrified ash, char, clinker, minerals, inorganic sludge byproducts and organic sludge byproducts, compost and soda ash
- Class 042 — Scientific and technological services: Engineering services, namely the design of installations for the treatment of sludge from wastewater and industrial wastewater treatment plants; engineering services and professional consulting services in fields of the building of and the drafting of plans for installations for the treatment of sludge from wastewater and industrial wastewater treatment plants
Owner
Prosecution history
- 21 Oct 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 28 Sept 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 28 Sept 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 28 Sept 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 23 Apr 2026 — REFUSAL PROCESSED BY IB
- 31 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 31 Mar 2026 — REFUSAL PROCESSED BY MPU
- 03 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 02 Mar 2026 — NON-FINAL ACTION WRITTEN
- 25 Feb 2026 — ASSIGNED TO EXAMINER
- 06 Jan 2026 — APPLICATION FILING RECEIPT MAILED
- 06 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 01 Jan 2026 — SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB