MY METAL FACTORY

Live / Registered — Registered (as of 03 Nov 2026)

What this means for you

Registered since 03 Nov 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 03 Nov 2032: the §71 affidavit of use).

Record

Serial number
79440236
Registration number
8528190
Mark type
Design + words
Filed
31 Oct 2025
Published for opposition
15 Sept 2026
Registered
03 Nov 2026
Next maintenance filing
§71 affidavit of use, due by 03 Nov 2032 (grace period to 03 May 2033)
Attorney of record
Jonathan M. Rixen

Goods and services

  • Class 037 — Building construction and repair services: Construction consultancy; construction of buildings; masonry; provision of information with respect to construction; installation of prefabricated building elements, namely, assembly services related to the installation of cladding, exterior siding; carpentry services; sealing services, namely, building sealing; insulation services, namely, installation of building insulation; roofing services; building construction supervision
  • Class 039 — Transportation and storage services: Distribution being delivery of goods; distribution being delivery of sheet metal, metal cladding, panels of metal for building and construction; distribution being delivery of metal building materials; distribution being delivery of metal hardware

Owner

Prosecution history

  • 03 Nov 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 03 Nov 2026 — REGISTERED-PRINCIPAL REGISTER
  • 15 Sept 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 15 Sept 2026 — PUBLISHED FOR OPPOSITION
  • 09 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 21 Aug 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 12 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 12 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 12 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 21 May 2026 — REFUSAL PROCESSED BY IB
  • 21 May 2026 — NEW REPRESENTATIVE AT IB RECEIVED
  • 28 Apr 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
  • 27 Apr 2026 — REFUSAL PROCESSED BY MPU
  • 18 Mar 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
  • 17 Mar 2026 — NON-FINAL ACTION WRITTEN

View this trademark record on Rightsy