HARBRIX

Live / Registered — Registered (as of 17 Nov 2026)

What this means for you

Registered since 17 Nov 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 17 Nov 2032: the §71 affidavit of use).

Record

Serial number
79439279
Registration number
8547263
Mark type
Word mark
Kind
Trademark
Register
Principal
Basis
Madrid Protocol (§66(a))
International registration
1410744
Filed
01 Oct 2025
Published for opposition
29 Sept 2026
Registered
17 Nov 2026
Next maintenance filing
§71 affidavit of use, due by 17 Nov 2032 (grace period to 17 May 2033)
Examining attorney
Kemberly Viveros
Attorney of record
Allison R. Imber, Esq.

Goods and services

  • Class 019 — Non-metallic building materials: Non-metallic structures and buildings, namely temporary, permanent and transportable structures and buildings for transportable housing in the nature of prefabricated housing and building units made of timber; non-metallic access platforms, work platforms, and scaffolding made of timber; access platforms, work platforms, and scaffolding made principally of wood; support structures made principally of wood; non-metallic cargo dunnage retention structures made of timber; non-metallic structures for packing and support for sea, air and road freight made of timber; bearings not of metal, namely, structural supports for use in building made of timber; non-metallic building materials made of timber, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, made principally of wood for constructing foundations or supports for scaffolding, cranes, hydraulic jacks and other machinery and vehicles; non-metallic brickwork supports made of timber; non-metallic gutter supports made of timber; non-metallic structural support members, namely nonmetallic structural support members for use in dry dock construction and repair of ships, and non-metallic structural support members for use in underground construction, made of timber; non-metallic secondary standing supports made of timber; non-metallic foundation materials for use in building, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, all made of timber; non-metallic foundation materials, namely, timber piles, filler slab, tile, posts, struts, rakers, ledgers, fencing, bracers, coupling pins, boards, brackets, frames, spacers, plates, transoms, rails, platforms, hatches, bracing, anchors, gates, timber and lumber, couplers, joints, decking, scaffolds, stairs, crosses, bases, for use in construction, all made of timber; non-metallic support fixings for building structures, made of timber; parapet supports made of timber, not of metal; pontoon supports of non-metallic materials, namely, brackets, deckings, crossmembers, beams, bulkheads, railings, bracers, pontoons, deck-cleats, cross-channels, sidewalks, runner boards, paneling, risers, all made of timber; non-metallic earth retaining structures made of timber; non-metallic retaining walls made of timber; floating docks made of timber, not of metal, for mooring boats; non-metallic fencing made of timber

Owner

Prosecution history

  • 17 Nov 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 17 Nov 2026 — REGISTERED-PRINCIPAL REGISTER
  • 29 Sept 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 29 Sept 2026 — PUBLISHED FOR OPPOSITION
  • 23 Sept 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 01 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 19 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 19 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 19 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 07 Jul 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 07 Jul 2026 — NON-FINAL ACTION E-MAILED
  • 07 Jul 2026 — NON-FINAL ACTION WRITTEN
  • 07 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 07 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 07 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED

View this trademark record on Rightsy