NOVAPTL
Live / Applied — Final refusal mailed (as of 07 Aug 2026)
What this means for you
Not registered yet, but its 01 Aug 2025 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 79434835
- Mark type
- Design + words
- Filed
- 01 Aug 2025
- Attorney of record
- Brent E Routman
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instructions for scientific, research, navigation, surveying, photographic, cinematographic, audiovisual, optical, weighing, measuring, signalling, detecting, testing, and inspecting, namely, porous electrodes for use in research and commercial water electrolysis; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; computers and computer peripheral devices; electrodes; apparatus and instruments for accumulating and storing electricity, namely, porous electrodes for use in research and commercial water electrolysis; electrical and electronic components, namely, electrodes being components for an electrolyser cell or electrolyser stack to be used in the field of hydrogen production through electrolysis; Electrolysis apparatus for laboratory use; electrolysis apparatus for laboratory and commercial use.
- Class 040 — Treatment of materials: Generation of energy; energy production and energy transformation into fuels by means of an electrochemical process, namely water electrolysis.
Owner
Prosecution history
- 21 Oct 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Oct 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Oct 2026 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 07 Aug 2026 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 07 Aug 2026 — FINAL REFUSAL E-MAILED
- 07 Aug 2026 — FINAL REFUSAL WRITTEN
- 14 Jul 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 14 Jul 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 14 Jul 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 12 Feb 2026 — REFUSAL PROCESSED BY IB
- 25 Jan 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 24 Jan 2026 — REFUSAL PROCESSED BY MPU
- 23 Dec 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 22 Dec 2025 — NON-FINAL ACTION WRITTEN
- 16 Dec 2025 — ASSIGNED TO EXAMINER